Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Auckland Rise Upper Norwood London SE19 2DX

Awaiting decision Croydon 26/02768/GPDO

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a single storey rear extension which projects out from the rear wall of the original house by 4.8 metres, with an eaves height of 2.6 metres and a maximum roof height of 3 metres (amended description and drawings)

As published by the council, reference 26/02768/GPDO

Application record

Reference
26/02768/GPDO
Status
Awaiting decision
Received
25 Sep 2026
Validated
2 Oct 2026
Postcode
SE19 2DX

Timeline

Dates from the published record

  1. 25 Sep 2026

    Received by Croydon

  2. 2 Oct 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Oct 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Croydon took a median of 56 days over the applications it decided in the last year.

What happens while it is decided

This application is with Croydon for determination, against a statutory target of eight weeks. Over the last year Croydon's median decision took 56 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Croydon's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Parcels Of Land Adjacent To Auckland Rise, Church Road And Sylvan Hill London SE19 2DX

    19/05067/DISC Submitted 25 Oct 2019 100 yards away

    Part discharge of condition 4 (lamp columns and luminaires) of planning permission 16/06512/FUL for 'Demolition of buildings and erection of 6 buildings varying between three and five storeys in height comprising 29 two bedroom and 28 one bedroom flats. Provision of associated car parking, landscaping and other associated works'

    Granted Conditions New dwelling Demolition 7 docs
  • 79 Auckland Rise Upper Norwood London SE19 2DY

    26/00878/HSE Submitted 24 Mar 2026 100 yards away

    Erection of replacement outbuilding in the rear garden

    Decided Householder 11 docs
    Small domestic
  • 8 Auckland Close Upper Norwood London SE19 2DA

    21/02853/HSE Submitted 27 May 2021 150 yards away

    Alterations, erection of replacement roof, installation of timber cladding and installation of replacement windows and doors to existing detached garage/workshop and conversion of existing garage to office/gym/utility room/shed/storage area.

    Granted Householder Roofing Windows or glazing 8 docs
    Small domestic
  • 139 Auckland Road Upper Norwood London SE19 2RR

    23/00926/CAT Submitted 6 Mar 2023 150 yards away

    (T1) Sycamore: section fell to ground level (T2) Holm Oak: section fell to ground level (T5) Sycamore covered in Ivy: cut back from building by 2m (T6) Pittosporum: crown reduce and reshape by 30% (TG7) Row of Cypress trees: lift bottom of crown from 3.5m to 5m from road level

    Granted Trees 13 docs
  • 139 Auckland Road Upper Norwood London SE19 2RR

    23/00776/TRE Submitted 24 Feb 2023 150 yards away

    (T3) Sycamore: 3 metre height reduction and 2.5 metre lateral reduction (T4) Sycamore: 4 metre height reduction and 3 metre lateral reduction. (TPO 26, 2014)

    Granted Trees 15 docs
  • 8 Sylvan Hill Upper Norwood London SE19 2QF

    26/01337/LP Submitted 6 May 2026 150 yards away

    The application seeks confirmation that the proposed works do not constitute development for the purposes of Section 55 of the Town and Country Planning Act 1990 (TCPA 1990). The works are required solely to address identified fire-safety deficiencies within the existing building fabric and external wall construction and do not involve any operational development or material alteration to the buildings.

    Decided