Skip to content
PlanIndex Get alerts
Menu

Planning application

21 Zion Road Thornton Heath CR7 8RJ

Granted Croydon 24/04206/LP LDC (Proposed) Operations edged

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey side extension to the rear of the property.

As published by the council, reference 24/04206/LP

Application record

Reference
24/04206/LP
Type
LDC (Proposed) Operations edged
Status
Decided
Decision
Lawful Dev. Cert. Granted (proposed)
Received
12 Dec 2024
Validated
12 Dec 2024
Decided
18 Dec 2024
Ward
Thornton Heath
Decision by
Delegated Business Meeting
Postcode
CR7 8RJ

Timeline

Dates from the published record

  1. 12 Dec 2024

    Received by Croydon

  2. 18 Dec 2024

    Decision issued: Lawful Dev. Cert. Granted (proposed)

  3. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

92 applications on PlanIndex · across 11 councils · 85% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 37 Zion Road Thornton Heath CR7 8RJ

    26/02451/LP Submitted 28 Aug 2026 52m away

    76% historically approved · decision due ~23 Oct

    Erection of an L-shaped dormer and installation of one rooflight to the front roof slope.

    Awaiting decision Loft or dormer 2 docs
  • Various Sites In Whitehorse Lane South Norwood London SE25 6UR

    21/02649/ADV Submitted 20 May 2021 73m away

    Display of 10 lamppost banner sites along Whitehorse Lane between junction B266 Thornton Heath High Street to the south and S Norwood Hill to the North in the London Borough of Croydon.

    Granted Advertising 20 docs
  • Various Sites In High Street Thornton Heath CR7 8RU

    21/02650/ADV Submitted 20 May 2021 83m away

    Display of 5 lamppost banner sites along B266 Thornton High Street between junction Whitehorse Lane to the south and The Drive to the north in the London Borough of Croydon.

    Granted Advertising 20 docs
  • 35 Gilsland Road Thornton Heath CR7 8RQ

    19/05148/LE Submitted 30 Oct 2019 84m away

    Conversion of single dwellinghouse (C3) to 6 person House in Multiple Occupation (C4) (existing use)

    Granted Amendments 5 docs
    Domestic
  • 1 High Street Thornton Heath CR7 8RU

    26/00981/DISC Submitted 1 Apr 2026 89m away

    Application for approval of details reserved by condition numbers 3 (details), 4 (construction logistics plan), 5 (air quality), 6 (contamination), 7 (landscaping), 9 (noise), 10 (highways condition survey), and 12 (delivery and servicing management plan) attached to planning permission ref. 24/04305/FUL (Erection of a first, second floor and mansard roof extension on existing building to provide a four-storey building to accommodate the retention of the existing commercial unit (Class E) at ground floor level, with 8 flats proposed on the upper floors with associated cycle and refuse storage).

    Granted Conditions New dwelling Extension +1 30 docs
    Several homes
  • 361 Whitehorse Road Croydon CR7 8SD

    19/05041/LE Submitted 24 Oct 2019 91m away

    Conversion of single dwellinghouse (C3) to 6 person House in Multiple Occupation (C4) (existing use)

    Granted Amendments 7 docs
    Domestic

In Croydon

  • 26/01914/GPDO Granted

    72 Kynaston Road Thornton Heath CR7 7AY

    Erection of a single storey rear extension which projects out from the rear wall of the original house by 4 metres, with an eaves height of 2.68 metres and a maximum roof height of 3.77 metres and erection of a rear/side extension which projects out from the side wall of the original house by a maximum of 1.859 metres for a depth of 3.816 metres, with an eaves height of 2.8 metres and a maximum roof height of 3 metres.

    2 Jul 2026 Outline
  • 26/00503/GPDO Granted

    70B Stafford Road Croydon CR0 4NE

    Change of use from Light Industrial (Use Class Egiii) to Residential (Use Class C3) to create 28 flats under Schedule 2, Part 3, Class MA of the Town and Country Planning (General Permitted Development) (England) Order 2015

    17 Feb 2026 Outline
  • 26/01892/LP Granted

    4 Milner Road Thornton Heath CR7 8JQ

    Erection of rear dormer and installation of two skylights in the front roof.

    30 Jun 2026 Outline
  • 26/01758/LP Granted

    28 Burrell Close Croydon CR0 7QL

    Lawful Development Certificate (192) for proposed conversion of existing garage, including relocation of the front door and installation of a new front window.

    17 Jun 2026 Outline
  • 26/01333/LP Refused

    10 Upper Selsdon Road South Croydon CR2 8DE

    Erection of a single storey side extension

    6 May 2026 Outline