Planning application
Purley Leisure Centre 50 High Street Purley CR8 2AA
Works: Demolition
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Demolition of the existing buildings and erection of buildings of 5 to 12 storeys to provide a leisure centre (Use Class F2), an Integrated Retirement Community comprising a mix of Specialist Older Persons Housing and Care Accommodation for older people (Use Classes C2 and C3), car parking, landscaping, and associated works (amended description).
As published by the council, reference 24/00775/FUL
Application record
- Reference
- 24/00775/FUL
- Category
- Full applications
- Status
- Decided
- Received
- 4 Mar 2024
- Validated
- 15 Mar 2024
- Decided
- 15 Oct 2026
- Ward
- Purley And Woodcote
- Postcode
- CR8 2AA
Timeline
Dates from the published record
-
4 Mar 2024
Received by Croydon
-
15 Mar 2024
Validated
Checked as complete and ready for consideration.
-
15 Oct 2026
Decision issued
-
15 Oct 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Avison Young Limited Agent
1,567 applications on PlanIndex · across 180 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordPolaska Assets Limited Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
226 documents on file for this application
- GRANTED (106G) FULL - DEC NOTICE
- S106 LEGAL AGREEMENT
- FVA - CJ RESPONSE
- FVA - LLR
- ITEM 5.1 PURLEY LEISURE CENTRE PURLEY
- LEISURE FACILITY - GROUND FLOOR GA
- PROPOSED BLOCK PLAN
- PHS-ACM-02-A00-DR-CE-000002
- BIODIVERSITY METRIC CALCULATION TOOL
- DEPARTURE - NOTICE UNDER ARTICLE 15
- DESIGN & ACCESS STATEMENT
- DLSL & OVERSHADOWING ADDENDUM 2
- DLSL & OVERSHADOWING ADDENDUM 1
- DLSL & OVERSHADOWING REPORT
- ENERGY STRATEGY REV 05
- CARBON SPREADSHEET V2.0_0 REV 01
- ENERGY - BE GREEN BRUKL
- ENERGY - BE LEAN BRUKL
- FIRE GATEWAY ONE STATEMENT
- FIRE PLANNING STATEMENT
- FIRE MEMO
- FVA COVER LETTER
- FVA - LLR APPRAISAL
- FVA - SO APPRAISAL
- HTVIA ADDENDUM
- MICROCLIMATE ADDENDUM
- NOISE AND VIBRATION ASSESSMENT
- PLANNING STATEMENT ADDENDUM
- TRANSPORT ADDENDUM
- AMENDMENTS COVERING LETTER
- AIR QUALITY ASSESSMENT REV 5
- PRE-DEMOLITION AUDIT
- ROAD SAFETY AUDIT APPENDICES
- ROAD SAFETY AUDIT
- WHYTECLIFFE ROAD SOUTH - VISIBILITY
- WHYTECLIFFE ROAD SOUTH - PEDESTRIAN VISIBILITY
- TRANSPORT - TFL RESPONSE NOT
- TRANSPORT - LBC RESPONSE NOT
- WHOLE LIFE-CYCLE CARBON ASSESSMENT
- WHOLE LIFE-CYCLE CARBON TEMPLATE
- WHOLE LIFE-CYCLE CARBON MEMO
- CIRCULAR ECONOMY MEMO
- 0450 - BAY STUDY 01 - BUILDING A TYPICAL LOWER
- 0451 - BAY STUDY 02 - BUILDING A TYPICAL UPPER
- 0452 - BAY STUDY 03 - BUILDING B TYPICAL LOWER (PUBLIC REALM)
- 0453 - BAY STUDY 04 - BUILDING B MIDDLE
- 0454 - BAY STUDY 05 - BUILDING B TYPICAL TOP
- 0455 - BAY STUDY 06 - BUILDING B LEISURE CENTRE ENTRANCE
- 0456 - BAY STUDY 07 - BUILDING C TYICAL LOWER
- 0457 - BAY STUDY 08 - BUILDING C TYPICAL MIDDLE
- 0458 - BAY STUDY 09 - BUILDING C TYPICAL TOP
- 0459 - BAY STUDY 10 - BUILDING D TYPICAL LOWER
- 0460 - BAY STUDY 11 - BUILDING D TYPICAL MIDDLE/UPPER
- 0404 - BUILDING A ELEVATIONS
- 0405 - BUILDING B ELEVATIONS
- 0400 - NORTH EAST ELEVATION
- 0401 - SOUTH EAST ELEVATION
- 0403 - SOUTH WEST ELEVATION
- 0402 - WEST ELEVATION
- 0406 - BUILDING C AND D ELEVATIONS
- 0300 - GA SECTION AA
- 0301 - GA SECTION BB
- 0302 - GA SECTION CC
- 0303 - GA SECTION DD
- 0150 - PROPOSED BLOCK PLAN
- LEISURE FACILITY - BASEMENT GA
- LEISURE FACILITY - GROUND FLOOR GA
- LEISURE FACILITY - MEZZANINE GA
- 0204 - LEVEL 01
- 0205 - LEVEL 02
- 0206 - LEVEL 03
- 0207 - LEVEL 04
- 0208 - LEVEL 05
- 0209 - LEVEL 06
- 0210 - LEVEL 07
- 0211 - LEVEL 08
- 0212 - LEVEL 09
- 0213 - LEVEL 10
- 0214 - LEVEL 11
- 0200 - BASEMENT LEVEL
- 0201 - LOWER GF LEVEL
- 0202 - MEZZANINE LEVEL
- 0215 - LEVEL 12 (ROOF)
- 0203 - UPPER GF PLAN
- DRAINAGE STRATEGY - P05
- SUDS MANAGEMENT AND MAINTENANCE PLAN - P02
- FLOOD RISK ASSESSMENT - P05
- LANDSCAPE STATEMENT
- DAYLIGHT OR SUNLIGHT ASSESSMENT 1/8
- DAYLIGHT OR SUNLIGHT ASSESSMENT 2/8
- DAYLIGHT OR SUNLIGHT ASSESSMENT 3/8
- DAYLIGHT OR SUNLIGHT ASSESSMENT 4/8
- DAYLIGHT OR SUNLIGHT ASSESSMENT 8/8
- DAYLIGHT OR SUNLIGHT ASSESSMENT 7/8
- DAYLIGHT OR SUNLIGHT ASSESSMENT 6/8
- DAYLIGHT OR SUNLIGHT ASSESSMENT 5/8.
- ENERGY STRATEGY
- DEPARTURE - NOTICE UNDER ARTICLE 15
- PRE-APP RESPONSE FEB 2024
- DRP 2
- DRP 1
- PRE-APP RESPONSE MAY 2023
- PRE-APP RESPONSE DECEMBER 2023
- FINANCIAL VIABILITY ASSESSMENT
- DESIGN AND ACCESS STATEMENT 1/4
- DESIGN AND ACCESS STATEMENT 2/4
- DESIGN AND ACCESS STATEMENT 3/4
- DESIGN AND ACCESS STATEMENT 4/4
- FULL - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- FLOOR PLAN - UPPER GROUND
- APPLICATION FORM - WITHOUT PERSONAL DATA
- AIR QUALITY ASSESSMENT 1/2
- AIR QUALITY ASSESSMENT 2/2
- TREE SURVEY
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT 1
- BIODIVERSITY GAIN PLAN
- ECOLOGICAL APPRAISAL
- FLOOD RISK ASSESSMENT 1/11
- FLOOD RISK ASSESSMENT 2/11
- FLOOD RISK ASSESSMENT 3/11
- FLOOD RISK ASSESSMENT 4/11
- FLOOD RISK ASSESSMENT 5/11
- FLOOD RISK ASSESSMENT 6/11
- FLOOD RISK ASSESSMENT 7/11
- FLOOD RISK ASSESSMENT 8/11
- FLOOD RISK ASSESSMENT 9/11
- FLOOD RISK ASSESSMENT 10/11
- FLOOD RISK ASSESSMENT 11/11
- HEALTH IMPACT ASSESSMENT
- 4 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- 5 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- 6 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- 7 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- 8 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- 9 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- 10 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- 1 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- 2 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- 3 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- NOISE IMPACT ASSESSMENT
- SOCIO-ECONOMIC IMPACT ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- SUSTAINABILITY - BREEAM
- WIND MICRO CLIMATE ASSESSMENT
- TRAVEL PLAN
- DELIVERY AND SERVICING PLAN
- OPERATIONAL WASTE MANAGEMENT STRATEGY
- OUTLINE WASTE MANAGEMENT PLAN
- LAND CONTAMINATION ASSESSMENT 3/6
- LAND CONTAMINATION ASSESSMENT 4/6
- LAND CONTAMINATION ASSESSMENT 5/6
- LAND CONTAMINATION ASSESSMENT 6/6
- LAND CONTAMINATION ASSESSMENT 1/6
- LAND CONTAMINATION ASSESSMENT 2/6
- LANDSCAPING DETAILS - UPPER GROUND FLOOR PLAN
- LANDSCAPING DETAILS - LEVEL 08 AMENITY ROOF PLAN
- LANDSCAPING DETAILS - LEVEL 09 AMENITY ROOF PLAN
- LANDSCAPING DETAILS - ROOF PLAN
- LANDSCAPING DETAILS - LOWER GROUND FLOOR PLAN
- DEMOLITION FIRST FLOOR PLAN
- DEMOLITION SECOND FLOOR PLAN
- DEMOLITION THIRD FLOOR PLAN
- DEMOLITION FOURTH FLOOR PLAN
- DEMOLITION ROOF PLAN
- DEMOLITION GROUND FLOOR PLAN
- FLOOR PLAN - EXISTING
- FLOOR PLAN - EXISTING
- FLOOR PLAN - EXISTING
- FLOOR PLAN - EXISTING
- FLOOR PLAN - EXISTING
- ROOF PLAN - EXISTING
- THE LOCATION PLAN
- ELEVATION (FRONT) - EXISTING
- ELEVATION (REAR) - EXISTING
- SECTION - EXISTING
- BLOCK PLAN OF THE SITE
- FLOOR PLAN - 06
- FLOOR PLAN - 07
- FLOOR PLAN - 08
- FLOOR PLAN - 09
- FLOOR PLAN - 10
- FLOOR PLAN - 11
- FLOOR PLAN - BASEMENT LEVEL
- FLOOR PLAN - LOWER GF
- FLOOR PLAN - MEZZANINE LEVEL
- ROOF PLAN - PROPOSED
- FLOOR PLAN - 01
- FLOOR PLAN - 02
- FLOOR PLAN - 03
- FLOOR PLAN - 04
- FLOOR PLAN - 05
- SECTION BB - PROPOSED
- SECTION CC - PROPOSED
- SECTION DD - PROPOSED
- SECTION AA - PROPOSED
- ELEVATION (FRONT) - PROPOSED BUILDING B
- ELEVATION (FRONT) - PROPOSED NORTH EAST
- ELEVATION (FRONT) - PROPOSED SOUTH EAST
- ELEVATION (REAR) - PROPOSED SOUTH WEST
- ELEVATION (SIDE) - PROPOSED WEST ELEVATION
- ELEVATION (FRONT) - PROPOSED BUILDING C AND D
- ELEVATION (FRONT) - PROPOSED BUILDING A
- BAY STUDY 06 - BUILDING B
- BAY STUDY 07 - BUILDING C
- BAY STUDY 08 - BUILDING C
- BAY STUDY 09 - BUILDING C
- BAY STUDY 10 - BUILDING D
- BAY STUDY 11 - BUILDING D
- BAY STUDY 01 - BUILDING A
- BAY STUDY 02 - BUILDING A
- BAY STUDY 03 - BUILDING B
- BAY STUDY 04 - BUILDING B
- BAY STUDY 05 - BUILDING B
- FIRE ENGINEERING - GATEWAY ONE STATEMENT
- FIRE SAFETY STATEMENT FOR PLANNING.
- TRANSPORT ASSESSMENT 2/4
- TRANSPORT ASSESSMENT 3/4
- TRANSPORT ASSESSMENT 4/4
- TRANSPORT ASSESSMENT 1/4
- OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- WHOLE LIFE-CYCLE CARBON ASSESSMENT
- CIRCULAR ECONOMY STATEMENT
- PRE-DEMOLITION AUDIT
- FOUL SEWAGE AND UTILITIES ASSESSMENT
- PLANNING STATEMENT
- COVERING LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Croydon has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
16-22 High Street Purley CR8 2AA
Discharge of conditions 2 and 7 attached to planning permission ref.15/05323/P for the Demolition of existing buildings; erection of four storey building comprising 2no. ground floor A1/A2 Units with High Street frontage and 7 two bedroom, 1 one bedroom and 1 four bedroom flats at the rear and on upper floors
Granted Conditions New dwelling Demolition 5 docs -
N W S House 1E High Street Purley CR8 2AF
63% historically approved · decision due ~9 Dec
External alterations on the front elevation to include the insertion of level access doors and external louvre grilles on the rear elevation.
Awaiting decision Full applications 10 docs -
4 High Street Purley CR8 2AA
Retrospective change of use from retail (Class E) to hot food takeaway (Sui generis), installation of extraction flue to rear.
Refused Full applications 19 docs -
Venture House Car Park 15 High Street Purley CR8 2AF
Discharge of condition 12 (materials) attached to planning permission 18/04812/FUL for the erection of a detached four storey building comprising of 2x studio, 2x one bedroom and 2x two bedroom flats. Provision of associated parking and landscaping.
Granted Conditions New dwelling 7 docs -
Venture House Car Park 15 High Street Purley CR8 2AF
Discharge of Condition 5 (Verification Report) attached to planning permission ref. 18/04812/FUL for the erection of a detached four storey building comprising of 2x studio, 2x one bedroom and 2x two bedroom flats. Provision of associated parking and landscaping.
Granted Conditions New dwelling 4 docs -
5 Godstone Road Purley CR8 2DH
63% historically approved · decision due ~7 Dec
Erection of a single storey rear extension to be used as office space
Awaiting decision Full applications ExtensionSmall domestic
Other full applications
In Croydon
-
25/02720/FUL Decided
39 Broughton Road Thornton Heath CR7 6AG
Conversion of existing dwellinghouse to form 2x two bedroom flats and provision of associated amenity space, parking, refuse and cycle stores.
-
24/03371/FUL Decided
The Vicarage 1B St James Road Purley CR8 2DL
Demolition of existing house and detached garage. Erection of double storey detached house. Alteration to driveway and associated landscaping. Alterations include changes to land level and raised terrace.
-
26/02015/FUL Withdrawn
Londis 375 Purley Way Croydon CR0 4NX
Replacement of the existing hand car wash with a modern automatic rollover car wash within the existing structure, including associated equipment and ancillary works
-
26/02513/FUL Decided
Land And Buildings Rear Of 1 - 7 Gresham Road South Norwood London SE25 5JT
Erection of a detached two storey dwellinghouse (Use Class C3) following the demolition of existing garages. Provision of associated amenity, cycle parking, waste storage spaces and alterations including landscaping.
-
26/02480/FUL Decided
8 Bisenden Road Croydon CR0 6UN
Change of use from a single dwellinghouse (Use Class C3) to a 6-bedroom 6 person Multiple Occupation (HMO) (Use Class C4) (retrospective)