Skip to content
PlanIndex Get alerts
Menu

Planning application

60 Haydn Avenue Purley CR8 4AF

Granted Croydon 23/00942/LP LDC (Proposed) Operations edged

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of dormer extension on side/rear roofslope

As published by the council, reference 23/00942/LP

Application record

Reference
23/00942/LP
Type
LDC (Proposed) Operations edged
Status
Decided
Decision
Lawful Dev. Cert. Granted (proposed)
Received
7 Mar 2023
Validated
7 Mar 2023
Decided
2 May 2023
Ward
Kenley
Decision by
Delegated Business Meeting
Postcode
CR8 4AF

Timeline

Dates from the published record

  1. 7 Mar 2023

    Received by Croydon

  2. 2 May 2023

    Decision issued: Lawful Dev. Cert. Granted (proposed)

  3. 10 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

ARK DRAFTING STUDIO Agent, a design practice

14 applications on PlanIndex · across 4 councils · 86% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Croydon granted permission on 2 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 71 Haydn Avenue Purley CR8 4AJ

    26/02346/HSE Submitted 18 Aug 2026 104m away

    81% historically approved · decision due ~2 Nov

    Erection of single-storey rear extension. Alterations to roof form including erection of side roof extension, front and rear dormer roof extensions. Relocation of rear garden steps.

    Awaiting decision Householder Extension Loft or dormer
    Small domestic
  • East Cliff House 5 Highland Road Purley

    21/01547/DISC Submitted 25 Mar 2021 221m away

    Discharge of condition numbers 4 (landscaping), 5 (child's playspace), 8 (privacy screens), 10 (cycle storage) and 12 (EVCP) attached to planning permission ref. 19/03074/FUL (Demolition of existing detached house and detached garage and replacement with 9 new appartments in a single block with parking to the front).

    Granted Conditions New dwelling Demolition 16 docs
  • East Cliff House 5 Highland Road Purley

    21/04268/NMA Submitted 13 Aug 2021 221m away

    Non-material amendment to PP 19/03074/FUL (Demolition of existing detached house and detached garage and replacement with 9 new apartments in a single block with parking to the front.).

    Granted Amendments New dwelling Demolition 4 docs
    Several homes
  • 13 Haydn Avenue Purley CR8 4AG

    21/03674/FUL Submitted 9 Jul 2021 254m away

    Demolition of existing dwelling and erection of a four storey building comprising 7 self-contained flats, land level changes including excavation, new vehicular crossover and parking, external refuse/recycling storage and cycle parking and other associated works.

    Refused Full applications New dwelling Demolition 21 docs
    Domestic
  • 10 Haydn Avenue Purley CR8 4AE

    21/00960/FUL Submitted 26 Feb 2021 305m away

    Alterations including part change of use of the site to an outdoor nursery (use class D1), including the erection of three temporary outbuildings to the rear of the site.

    Granted Full applications 9 docs
  • 39 Hartley Hill Purley CR8 4EP

    24/03200/HSE Submitted 17 Sep 2024 313m away

    Formation of new vehicular access and provision of a raised platform to provide two car parking spaces to the front of the site.

    Refused Householder 11 docs
    Domestic

In Croydon

  • 26/00816/OUT Decided

    165 Godstone Road And Land R/O Of Birchwood Court And Douglas Court Kenley CR8 5BL

    Outline application for demolition of 165 Godstone Road and erection of 8no. 3 bedroom semi-detached houses. (Access, Layout, and Scale ONLY to be considered).

    17 Mar 2026 Outline
  • 26/02161/OUT Awaiting decision

    2A Addiscombe Avenue Croydon CR0 6LH

    Details of appearance, landscaping, layout and scale for the erection of two (2) pairs of two-storey semi-detached dwellinghouses with habitable roof levels (Use Class C3) and one (1) two storey detached building for use as a House in Multiple Occupation (HMO) for up to 8 persons with habitable roof levels (Use Class Sui Geniris) (following demolition of existing two-storey dwellinghouse and detached garage), Associated amenity, cycle parking and waste storage spaces (Outline Application)

    30 Jul 2026 Outline
  • 26/02162/OUT Awaiting decision

    2A Addiscombe Avenue Croydon CR0 6LH

    Details of layout and scale for erection of two (2) pairs of two-storey semi-detached dwellinghouses with habitable roof levels (Use Class C3) (following demolition of existing two-storey dwellinghouse and detached garage), associated amenity, cycle parking and waste storage spaces, and Alterations (Outline Application)

    30 Jul 2026 Outline
  • 26/01916/OUT Awaiting decision

    96 - 98 Braemar Avenue South Croydon CR2 0QB

    Outline Planning Permission for the demolition of the existing single storey office, storage building and meeting hall and erection of three storey building (with accommodation within the roof) comprising a church hall and 6 flats with associated parking, bin and bike storage, with all matters reserved

    2 Jul 2026 Outline
  • 26/01621/LP Granted

    19 Mallard Road South Croydon CR2 8PX

    Conversion of the existing garage into habitable space (Office Room), including the installation of a new raised flat roof and all associated construction works.

    3 Jun 2026 Outline