Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Hesterman Way Croydon CR0 4YA

Granted Croydon 19/05325/FUL Full planning permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Front, rear and side extensions to the building. Introduction of side by side drive thru ordering, including new drive thru booths, a new island for signage and amendments to kerb lines with associated works to the site. The installation of 2 no. Customer Order Displays (COD) with overhead Canopies, a Goal Post height restrictor and new digital signage suite. Alterations to elevations to a new "Folded Roof" concept.

As published by the council, reference 19/05325/FUL

Application record

Reference
19/05325/FUL
Type
Full planning permission
Status
Decided
Decision
Permission Granted
Received
11 Nov 2019
Validated
11 Nov 2019
Decided
23 Dec 2019
Ward
Broad Green
Decision by
Delegated Business Meeting
Postcode
CR0 4YA

Timeline

Dates from the published record

  1. 11 Nov 2019

    Received by Croydon

  2. 23 Dec 2019

    Decision issued: Permission Granted

  3. 20 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Bury St. Edmunds

543 applications on PlanIndex · across 125 councils · 96% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 22 Hesterman Way Croydon CR0 4YA

    19/05326/ADV Submitted 11 Nov 2019 0m away

    Installation of 5 no. freestanding digital signs and 1 no. booth screen

    Granted Advertising 13 docs
  • McDonald's Restaurant 22 Hesterman Way Croydon CR0 4YA

    19/05146/ADV Submitted 30 Oct 2019 0m away

    Relocation of existing signage and installation of new fascia signs and a wall mounted sign

    Granted Advertising 6 docs
  • 14 Daniell Way Croydon CR0 4YJ

    22/04893/FUL Submitted 22 Nov 2022 138m away

    Demolition of external ductwork and existing 1no. air conditioning unit. Installation of 10no. air conditioning units and relocation of rear door.

    Granted Full applications Demolition 10 docs
  • Car Park Outside B And Q Hesterman Way Croydon CR0 4YA

    24/03343/PA8 Submitted 30 Sep 2024 290m away

    The installation of a new 20m-high telecommunications monopole supporting 6no. antennas and 2no. transmission dishes, plus associated ground-based equipment cabinets; and ancillary development thereto.

    Refused Telecoms 15 docs
  • Former National Driving Centre Marlowe Way Beddington CR0 4XS

    DM2025/01120 Submitted 29 Aug 2025 300m away

    Provision of new road surface and hardstanding, removal of kerbs, provision of new boundary treatments and installation of two floodlight lighting columns.

    Granted Full applications 35 docs
  • Brandon House Marlowe Way Beddington CR0 4XS

    DM2023/01504 Submitted 2 Oct 2023 315m away

    Installation of 40 electrical vehicle charging points including feeding pillars within a private car park.

    Granted Outline 10 docs

In Croydon

  • 26/02489/FUL Awaiting decision

    Rowdown Primary School Calley Down Crescent Croydon CR0 0EG

    Installation of air source heat pumps and associated works including compound enclosure.

    2 Sep 2026 Full applications
  • 26/02485/FUL Awaiting decision

    3 Highdaun Drive Norbury London SW16 4LY

    Demolition of existing dwelling and garage, erection of two-storey detached dwelling with accommodation in the roof space, excavation to provide basement accommodation and attached garage, erection of single storey outbuilding in rear garden and provision of associated landscaping and refuse storage.

    1 Sep 2026 Full applications
  • 26/02483/FUL Awaiting decision

    Selsdon Park Hotel 126 Addington Road South Croydon CR2 8YA

    Installation of new plant equipment including associated pipework, vents and screening following removal of items of existing plant

    1 Sep 2026 Full applications
  • 26/02480/FUL Awaiting decision

    8 Bisenden Road Croydon CR0 6UN

    Retrospective planning application for the change of use from a single dwellinghouse (Use Class C3) to a 6-bedroom 6 person Multiple Occupation (HMO) (Sui Generis)

    1 Sep 2026 Full applications
  • 25/04089/FUL Granted

    Saints And Sinners 482 London Road Croydon CR0 2SS

    Retention of pub on ground floor, demolition of rear extensions, erection of rear extensions at ground, first, second and third (roof) floors, use of first, second and third floors as a 13-bedroom House in Multiple Occupation (HMO) with associated landscaping, bin and cycle storage.

    23 Dec 2025 Full applications