Planning application
35 Green Lane, Northgate, Crawley
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior notification for the demolition of existing single storey rear extension and erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 6M, and have a maximum height of 3.15M and an eaves height of 2.95M
As published by the council, reference CR/2024/0708/HPA
Application record
- Reference
- CR/2024/0708/HPA
- Type
- Status
- Status
- Prior Approval Not Required
- Decision
- Granted As published: PRIOR APPROVAL NOT REQUIRED
- Received
- 24 Dec 2024
- Decided
- 29 Jan 2025
- Decision by
- Delegated
Site history
Applications at this address on the Crawley register
This site has had 3 applications since 2024: 2 approved, 1 refused.
-
CR/2026/0291/FUL Granted
35 Green Lane, Northgate, Crawley
Conversion of loft with hip to gable end and insertion of rear dormer window, front roof light and window in side elevation.
-
CR/2025/0726/FUL Refused
35 Green Lane, Northgate, Crawley
Erection of single storey front extension. Conversion of loft with hip to gable end and insertion of rear dormer. Insertion of roof light on front elevation and side window on second floor. (Amended description)
Timeline
Dates from the published record
-
24 Dec 2024
Received by Crawley
-
29 Jan 2025
Decision issued: PRIOR APPROVAL NOT REQUIRED
-
7 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Crawley granted permission on 29 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Crawley's portal will say. Our guide explains the common types.