Skip to content
PlanIndex Get alerts
Menu

Planning application

Hurle Vent House Fillpoke Lane Blackhall Rocks Hartlepool TS27 4BS

Granted County Durham DM/26/02157/FPA

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two storey side extension, two storey rear extension, single storey rear extension with veranda above with 2 two storey bay window extension to front and pitched roof over existing side extension (garage) with conversion of garage into habitable room

As published by the council, reference DM/26/02157/FPA

Application record

Reference
DM/26/02157/FPA
Status
Decided
Decision
Granted As published: Approved BNG Not Required
Received
17 Aug 2026
Validated
21 Aug 2026
Decided
15 Oct 2026
Ward
Blackhalls And Hesledens
Parish
Monk Hesleden
Decision by
Delegated
Postcode
TS27 4BS

Timeline

Dates from the published record

  1. 17 Aug 2026

    Received by County Durham

  2. 21 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 1 Sep 2026

    Added to PlanIndex

  4. 15 Oct 2026

    Decision issued: Approved BNG Not Required

  5. 16 Oct 2026

    Status changed to Decided

    Previously Pending Consideration.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

  • NEIGHBOUR NOTIFICATION LIST Neighbour Notification List · 01 Sep 2026
  • APPLICATION FORM Application Form · 17 Aug 2026
  • LOCATION PLAN OS Extract · 17 Aug 2026
  • EXISTING AND PROPOSED SITE PLAN Drawing · 17 Aug 2026
  • PLANNING DESIGN AND ACCESS STATEMENT Supporting Information · 17 Aug 2026
  • EXISITING AND PROPOSED PLANS Drawing · 17 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

County Durham granted permission on 15 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on County Durham's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles