Skip to content
PlanIndex Get alerts
Menu

Planning application

Land West Of Aireville Loaning Burn Easington Village SR8 3TX

Granted County Durham DM/26/00397/VOC Variation of Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for the variation of Condition 1 (approved plans) to allow for the resiting of dwellings and amended land levels, and for the removal of Condition 2 (materials), Condition 7 (EV charging), and Condition 8 (bin store), as the required details have been submitted pursuant to application DM/24/03198/RM

As published by the council, reference DM/26/00397/VOC

Application record

Reference
DM/26/00397/VOC
Type
Variation of Condition
Status
Decided
Decision
Granted As published: Approved BNG Not Required
Received
18 Feb 2026
Validated
27 Feb 2026
Decided
20 May 2026
Ward
Easington And Shotton
Parish
Easington Village
Decision by
Full Delegated
Postcode
SR8 3TX

Timeline

Dates from the published record

  1. 18 Feb 2026

    Received by County Durham

  2. 27 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 20 May 2026

    Decision issued: Approved BNG Not Required

  4. 20 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

John Waugh Architect Agent, an architecture practice

14 applications on PlanIndex · across 3 councils · 90% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

County Durham granted permission on 20 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Seaton Holme Hall Walk Easington Village Peterlee SR8 3BS

    DM/26/02058/TCA Submitted 5 Aug 2026 0.3 miles away

    T6 Sycamore - reduce canopy by 1.5m to provide clearance from building T7 Downey Birch - remove dead branch back to branch bark ridge T8 Norway Maple - reduce deadwood from canopy & reduce canopy by .5 m T9 Sycamore - reduce canopy by 1.5 m T13 Sycamore - remove dead medium diameter branch & remove affected branch containing cavity T18 Common Beech - reduce crown by 20% (approx 3 metres) T19 Sycamore - sever ivy at 2 m above ground level T20 Sycamore - sever ivy at 2 m above ground level T21 Common Horse Chestnut - Install cable bracing system T23 Sycamore - undertake sectional dismantling to ground level T29 Sycamore - reduce eastern canopy by 1.5 metres

    Granted Trees 5 docs
  • Junction House Farm Loaning Burn Easington Village Peterlee SR8 3TZ

    DM/26/00008/DRC Submitted 29 Dec 2025 0.3 miles away

    Discharge of Conditions 3 (biodiversity gain plan) and 4 (HMMP), pursuant to planning permission DM/24/00993/FPA

    Granted Conditions 2 docs

In County Durham

  • DM/26/02028/NMA Granted

    Greenfield Academy Greenfield Way Newton Aycliffe DL5 7LF

    Non-material amendment to install Cedral click horizontal cladding to the main eastern elevation (amended description 10.09.2026)

    Received 4 Aug, published by the council 18 Aug 2026 Amendments
  • DM/26/01976/VOC Granted

    26 Bankwell Drive High Etherley Bishop Auckland DL14 0HG

    Variation of Condition 2 (Approved Plans) pursuant to planning permission DM/26/00433/FPA to amend the approved plans by altering the approved extension materials and reducing the size of the extension.

    Received 29 Jul, published by the council 10 Aug 2026 Amendments
  • DM/26/01827/VOC Withdrawn

    Farm Building To The South East Of Hindberry Farm Stobhill Lane Bolam DL2 2UR

    Variation of condition 1 (approved plans) pursuant to planning permission DM/21/00466/VOC to amended the scheme layout, roof material and fenestration

    Received 15 Jul, published by the council 22 Jul 2026 Amendments
  • DM/26/01947/NMA Granted

    Southview Cottage Lanchester Durham DH7 0SS

    Non material amendment of DM/26/00376/FPA relating to replacing two first floor windows with Juliette balconies to the side and rear

    Received 27 Jul, published by the council 28 Aug 2026 Amendments
  • DM/25/02063/VOC Granted

    Land To The East Of 11 North Road East Wingate TS28 5AT

    Variation of condition 2 (Approved Plans) to reposition the location of the dwelling and omit the modular garage pursuant to planning permission DM/21/03011/FPA

    Received 28 Jul, published by the council 20 Jul 2026 Amendments