Planning application

Hawthorn Grid Site Murton DH6 2RX

Granted County Durham DM/24/00875/FPA Full Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The installation of electricity and fibre optic cabling between the Hawthorn Pit Solar Farm Substation and the National Grid Hawthorn Pit Substation and an access route associated with the Hawthorn Pit Solar Farm.

As published by the council, reference DM/24/00875/FPA

Application record

Reference
DM/24/00875/FPA
Type
Full Planning Application
Status
Decided
Decision
Approved
Received
2 Apr 2024
Validated
3 Apr 2024
Decided
29 Oct 2024
Ward
Murton (Historic)
Parish
Murton
Decision by
Full Delegated
Postcode
DH6 2RX

Timeline

Dates from the published record

  1. 2 Apr 2024

    Received by County Durham

  2. 3 Apr 2024

    Validated

    Checked as complete and ready for consideration.

  3. 29 Oct 2024

    Decision issued: Approved

  4. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Hawthorn Grid Site Murton DH6 2RX

    DM/22/03816/DRC Submitted 28 Dec 2022 155m away

    Discharge of Condition 9 (Landscape) of Planning Permission DM/22/00747/FPA

    Granted Conditions 5 docs
  • Hawthorn Grid Site Murton DH6 2RX

    DM/22/03643/DRC Submitted 8 Dec 2022 155m away

    Discharge of Condition 4 (Construction Management Plan) of Planning Permission DM/22/00747/FPA

    Granted Conditions 7 docs
  • Hawthorn Grid Site Murton DH6 2RX

    DM/26/01109/FPA Submitted 1 May 2026 221m away

    Full planning application for a temporary visitor centre at the EGL1 site compound for a period of up to 5 years

    Withdrawn Full applications 6 docs
  • Hawthorn Grid Site Murton DH6 2RX

    DM/25/02767/RM Submitted 3 Oct 2025 282m away

    Reserved Matters application (all matters, being details of the permanent access, appearance, landscaping, layout and scale) for the erection of a substation on land to the west of Jade Business Park pursuant to DM/22/01663/OUT

    Granted Reserved matters 30 docs
  • Hawthorn Grid Site Murton DH6 2RX

    DM/25/02444/DRC Submitted 3 Sep 2025 282m away

    99% historically approved · decision due ~29 Oct

    Discharge of Condition 39 (Archaeological Reporting) of Planning Permission DM/22/01663/OUT Archaeological Strip, Map and Excavation Assessment Report

    Awaiting decision Conditions
  • Hawthorn Grid Site Murton DH6 2RX

    DM/25/03471/DRC Submitted 15 Dec 2025 282m away

    Discharge of Condition 29 (Construction Traffic Management Plan) pursuant to DM/22/01663/OUT

    Granted Conditions 2 docs

In County Durham

  • DM/26/01154/FPA Granted

    2 Mill Court Bournmoor Houghton-le-spring DH4 6DJ

    Two-storey side and rear extensions with decking

    7 May 2026 Full applications
  • DM/26/01302/FPA Granted

    1 Plantation Street Leadgate Consett DH8 7PP

    Extension to front of building to provide new glazed entrance porch, replacement of existing entrance door and canopy with window, change double exit doors to single door and internal alterations.

    22 May 2026 Full applications
  • DM/26/00510/FPA Granted

    Clare Lodge Durham Road Chilton Ferryhill DL17 0HA

    Erection of detached shed and gym and hardstanding to front (amended description)

    2 Mar 2026 Full applications
  • DM/26/00876/FPA Granted

    Woodham Lodge Rushyford Ferryhill DL17 0NL

    Demolition of an existing steel portal building and erection of a replacement outbuilding to provide domestic carport/workshop space and storage associated with the upkeep and maintenance of the adjoining private landholding, together with associated hardstanding and landscaping.

    7 Apr 2026 Full applications
  • DM/26/01001/FPA Granted

    2 Melgrove Way Sedgefield Stockton On Tees TS21 2JN

    Single storey front extension and rear dormers (amended description)

    20 Apr 2026 Full applications