Planning application
Building Opposite 2 Derwent Place Shotley Bridge DH8 0JD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of former workshop to residential accommodation. New accommodation to form additional space to attached cottage. New attached car port.
As published by the council, reference DM/22/00968/FPA
Application record
- Reference
- DM/22/00968/FPA
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Approved
- Received
- 31 Mar 2022
- Validated
- 23 May 2022
- Decided
- 1 Mar 2023
- Ward
- Benfieldside (Historic)
- Parish
- No Parish
- Decision by
- Full Delegated
- Postcode
- DH8 0JD
Timeline
Dates from the published record
-
31 Mar 2022
Received by County Durham
-
23 May 2022
Validated
Checked as complete and ready for consideration.
-
1 Mar 2023
Decision issued: Approved
-
2 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Burnopfield
33 applications on PlanIndex · across 4 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land West Of The Garages To The Rear Of 23 And 25 Snows Green Road Shotley Bridge DH8 0HD
92% historically approved · decision due ~2 Sep
T2 and T3 - Oak trees - Fell and treat stump with eco-plugs - TPO-DER-048
Awaiting decision Trees -
13 Snows Green Road Shotley Bridge Consett DH8 0HD
Internal alterations to the master bedroom, guest bedroom, bathroom, dining room and corridor
Granted Heritage and listed buildings 14 docs -
Kaydar 5 - 7 Snows Green Road Shotley Bridge Consett DH8 0HD
94% historically approved · decision due ~30 Mar
Change of use of former care home (C2) to 2no. dwellinghouses (C3) including fenestration alterations
Awaiting decision Full applications Windows or glazing 16 docsSeveral homes -
Wood Manor Wood Street Shotley Bridge Consett DH8 0JE
Works to trees within a conservation area as amended on 19th January 2022.
Granted Trees 6 docs -
Shotley Cottage 28 Snows Green Road Shotley Bridge Consett DH8 0HA
92% historically approved · decision due ~28 Oct
Tree 1 - Chestnut- crown reduction and general prune, clearing limbs from close by cables. Tree 2 - Sycamore - crown reduction and general pruning, removal of limbs overhanging cables and highway. - TPO-DER-033H
Awaiting decision Trees 9 docs -
The Maltings Messenger Bank Shotley Bridge Consett DH8 0HT
T1 - Birch - Reduce and reshape corner tree by 1.5m to maintain at a scale suitable to the location. T2 - Birch - Reduce and reshape smaller tree to remove leggy growth (by upto 1m) to maintain at a scale suitable to the location. T3 - Mixed group - Prune back overhang from neighbouring Willow trees and woody shrubs close to the house, as by upto 1m. - Section 211 notice
Granted Trees 5 docs
Other full applications applications
In County Durham
-
DM/26/01154/FPA Granted
2 Mill Court Bournmoor Houghton-le-spring DH4 6DJ
Two-storey side and rear extensions with decking
-
DM/26/01302/FPA Granted
1 Plantation Street Leadgate Consett DH8 7PP
Extension to front of building to provide new glazed entrance porch, replacement of existing entrance door and canopy with window, change double exit doors to single door and internal alterations.
-
DM/26/00510/FPA Granted
Clare Lodge Durham Road Chilton Ferryhill DL17 0HA
Erection of detached shed and gym and hardstanding to front (amended description)
-
DM/26/00876/FPA Granted
Woodham Lodge Rushyford Ferryhill DL17 0NL
Demolition of an existing steel portal building and erection of a replacement outbuilding to provide domestic carport/workshop space and storage associated with the upkeep and maintenance of the adjoining private landholding, together with associated hardstanding and landscaping.
-
DM/26/01001/FPA Granted
2 Melgrove Way Sedgefield Stockton On Tees TS21 2JN
Single storey front extension and rear dormers (amended description)