Planning application
East Lodge Greta Bridge Barnard Castle DL12 9SE
Works: Roofing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Listed Building application for replacement roof and rainwater goods
As published by the council, reference DM/21/02780/LB
Application record
- Reference
- DM/21/02780/LB
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 4 Aug 2021
- Validated
- 4 Aug 2021
- Decided
- 28 Sep 2021
- Ward
- Barnard Castle East (Historic)
- Parish
- Rokeby
- Decision by
- Fast Track
- Postcode
- DL12 9SE
Timeline
Dates from the published record
-
4 Aug 2021
Received by County Durham
-
28 Sep 2021
Decision issued: Approved
-
2 Oct 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
JABA Architect Ltd Agent, an architecture practice registered in Bath
Active · incorporated 2003 · Bath
15 applications on PlanIndex · across 5 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
County Durham granted permission on 28 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
1 The Square Greta Bridge Barnard Castle DL12 9SD
97% historically approved · decision due ~3 Dec
Installation of a wood-burning stove flue through the conservatory roof.
Awaiting decision Heritage and listed buildings Extension -
1 The Square Greta Bridge Barnard Castle DL12 9SD
97% historically approved · decision due ~8 Dec
Conversion of the existing North-East Elevation window opening to form an external doorway, installation of an independent stone stair, landing and handrail, and associated internal alterations at No. 1 The Square, Greta Bridge.
Awaiting decision Heritage and listed buildings Windows or glazing 7 docs -
1 The Square Greta Bridge Barnard Castle DL12 9SD
94% historically approved · decision due ~8 Dec
Conversion of the existing North-East Elevation window opening to form an external doorway, installation of an independent stone stair, landing and handrail, and associated internal alterations.
Awaiting decision Windows or glazing -
Other heritage and listed building applications
In County Durham
-
DM/26/02422/LB Granted
Old Durham Gardens Bent House Lane Durham DH1 2RY
Installation of two metal information signs on the boundary of Old Durham Gardens
-
DM/26/02392/LB Granted
40 Tudhoe Village Spennymoor DL16 6LH
Add a sheet of black metal to the inside face of driveway gate railings.
-
DM/26/02265/LB Granted
7 Newgate And Church Cottage Newgate Barnard Castle DL12 8NQ
Creation of internal ground and first floor doorway openings between 7 Newgate and Church Cottage, in association with change of use of Church Cottage to commercial office (Class E) in association with existing accountancy practice (7 Newgate)
-
DM/26/01478/LB Granted
Holywell Farm Holy Well Lane Wolsingham Bishop Auckland DL13 3HB
Conversion of a redundant agricultural building into a small retail unit. The proposed works are all internal limited to the ground floor with the external fenestration being unaffected.
-
DM/26/00490/LB Refused
Poppy Cottage Romaldkirk Barnard Castle DL12 9EB
Internal reconfiguration to first floor shower room