Planning application

PA26/04973

Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB

Awaiting decision Cornwall Overhead Electricity Lines

Proposal

Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line

As published by the council, reference PA26/04973

Timeline

Dates from the published record

  1. 16 Jul 2026

    Received by Cornwall

  2. 31 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Cornwall for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

In Cornwall

  • PA26/04833 Awaiting decision

    Shelton Farm Delabole Cornwall PL33 9DA

    -Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ

    10 Jul 2026 Other
  • PA26/02728 Granted

    Old Redmoor Mine Area Redmoor Road Callington Cornwall

    Proposed mineral exploration drilling programme and associated developments involving drilling at 5 sites

    7 May 2026 Other
  • PA26/04550 Awaiting decision

    Land North Of West Langarth Farmhouse West Langarth Cornwall TR4 9AN

    Overhead Electricity Lines application to raise the height of an existing overhead 11kv line as per plan 5894345

    30 Jun 2026 Other
  • PA26/03364 Granted

    Trewinnick Farm Trewinnick Tintagel Cornwall PL34 0HL

    Install approximately 260mtrs of 11kV UG cable from pole 43LP7 to 45LP8 as shown on the attached plan 5853236s37. Add 43LP8 to network to create new terminal 11kV pole to support new overhead lines towards 43LP11 and connect to new UG cable from 43LP7. Replace pole 43LP11 and construct as a double terminal pole with addition of one new stay to have two stays on pole. Dismantle existing overhead line between 43LP7 and 43LP11 as shown highlighted blue on the attached plan and remove any redundant poles.

    15 May 2026 Other
  • PA26/04436 Awaiting decision

    Tintagel Primary School Treven Tintagel Cornwall PL34 0DU

    Overhead Electricity Lines application to: - install new freestanding pole mounted transformer pole - add 315kVA transformer and associated HV and LV cables and earth wires. - Repositioned LV pole 433288-4 and create new terminal connection from OHL to LV cable. - Replace pole 45LL5 and make single pole terminal with back stay supporting OHL towards 45LL6. New HV pole termination to be added to connect 45LL4 and 45LL5A as per plan. - Replace and relocate 45LL4 as per plan and make pole a terminal pole with back stay to support OHL towards 45LL3 and new HV pole termination connecting HV cable back to 45LL5

    25 Jun 2026 Other