Skip to content
PlanIndex Get alerts
Menu

Planning application

Shelton Farm Delabole Cornwall PL33 9DA

Granted Cornwall PA26/04833 Overhead Electricity Lines

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ

As published by the council, reference PA26/04833

Application record

Reference
PA26/04833
Type
Overhead Electricity Lines
Status
Decided
Decision
Granted As published: No objections (OHL/OHE/HG apps)
Received
10 Jul 2026
Validated
10 Jul 2026
Decided
18 Aug 2026
Ward
St Teath And Tintagel
Parish
Tintagel
Decision by
Peer Sign Off
Postcode
PL33 9DA

Timeline

Dates from the published record

  1. 10 Jul 2026

    Received by Cornwall

  2. 21 Jul 2026

    Added to PlanIndex

  3. 18 Aug 2026

    Decision issued: No objections (OHL/OHE/HG apps)

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

  • NOOHLZ - OHL NO OBJ (LETTER AND 2 FORMS) Correspondence Out · 18 Aug 2026
  • LOCATION PLAN Plan - Site Location · 10 Jul 2026
  • STREETVIEW PLAN Plan - Site Location · 10 Jul 2026
  • FORM B Application Form · 10 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cornwall granted permission on 18 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Cornwall

  • PA26/06662 Awaiting decision

    Street Record St Ervan Wadebridge Cornwall

    Upgrade and relocate existing 100kVa Transformer with a 315kVa unit. Install new 11.5m and 10.5m Stout poles to replace existing 11.5m Medium pole to house new transformer and associated equipment. A new back stay will be installed to support the overhead lines. Replace and relocate an existing 10.5m Medium pole with a 10m Medium pole. Pole to be relocated to edge of land title boundary due to access restrictions. Upgrade 192m of existing 25 Hard Drawn Copper overhead high voltage line to 3 phase by installing a third conductor along highlighted route. This reinforcement work is being carried out to improve network carrying capacity and reliability for customers in the Penrose area

    Received 23 Sep, published by the council 30 Sep 2026 Other
  • PA26/06624 Awaiting decision

    Higher Beeny Beeny Boscastle Cornwall PL35 0HL

    Overhead Electricity Lines to install 3rd wire for approximately 130 metres from pole 43LWA4 to 43LWA4B. Replace poles 43LWA4A and 43LWA4B on a like for like basis. Upgrade pole mounted transformer to a new 100kVA unit and replace all associated secondary wiring at pole 43LWA4B.

    Received 23 Sep, published by the council 30 Sep 2026 Other
  • PA26/06625 Awaiting decision

    Gwendreath Ruan Minor Helston Cornwall TR12 7LZ

    Overhead Electricity Lines to upgrade an existing two wire 11kV line to a three wire 11kV overhead line along with additional support poles / equipment to facilitate an upgrade to three phase in the Gwendreath, Ruan Minor area. In addition to the overhead equipment we will also be installing a section of underground cable.

    Received 23 Sep, published by the council 30 Sep 2026 Other
  • PA26/06587 Awaiting decision

    Plusha Launceston Cornwall PL15 7QT

    National Grid proposed to install a 3rd wire on existing poles between 45LCHB1-5. The overall distance of the 3rd wire works is 340 metres. Pole 45LCHB3 is planned to be replaced on a like for like basis and a new pole mounted transformer will be added. No other poles are planned to be replaced, however, if nearer the time of the works the poles are found to require replacement the additional poles will be replaced as part of this scheme as well. All pole replacement work would be completed on a like for like basis

    Received 22 Sep, published by the council 30 Sep 2026 Other
  • PA26/05569 Granted

    Lower Tolcarne Farm St Allen Truro Cornwall TR4 9QX

    Overhead Electricity Lines to add a 3rd wire to an existing 11kv overhead line

    Received 10 Aug, published by the council 24 Aug 2026 Other