Planning application
Newdowns Farm Nanstallon Bodmin Cornwall PL30 5LH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Overhead Electricity Lines application to add a third wire to the existing high voltage network
As published by the council, reference PA26/03953
Application record
- Reference
- PA26/03953
- Type
- Overhead Electricity Lines
- Status
- Decided
- Decision
- Granted As published: No objections (OHL/OHE/HG apps)
- Received
- 9 Jun 2026
- Validated
- 9 Jun 2026
- Decided
- 16 Jul 2026
- Ward
- Lanivet, Blisland And Bodmin St Lawrence
- Parish
- Lanivet
- Decision by
- Peer Sign Off
- Postcode
- PL30 5LH
Timeline
Dates from the published record
-
9 Jun 2026
Received by Cornwall
-
16 Jul 2026
Decision issued: No objections (OHL/OHE/HG apps)
-
21 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Cornwall granted permission on 16 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land West Of Higher Mulberry Nanstallon Bodmin Cornwall PL30 5LJ
Erection of Earth Banked Slurry Lagoon
Granted Full applications 24 docs
Other less common application types
In Cornwall
-
PA26/06205 Awaiting decision
Trenithon Farm Trenithon Lane Summercourt Newquay Cornwall TR8 5BJ
Overhead Electricity Lines application to add a third wire to be erected on a section of existing high voltage network
-
PA26/06019 Awaiting decision
Treago Mill Treago Road Crantock Newquay Cornwall TR8 5QS
NGED have received a connection request and three phase. To enable this connection there is a requirement to add a third wire to the overhead high voltage network from pole number 43AAE7 to 43AAF6, over 6 spans and a total of 381M, highlighted in green on the plan CE6038598SECT37. The existing high voltage overhead network from pole 43AAF6 to 43AAF8, over 2 spans and a total of 171M will be dismantled, highlighted in blue on the plan and replaced by an underground high voltage cable shown as the brown line on the plan. There is also a requirement to erect a lazy leg pole alongside pole number 43AAF8 to support the larger three phase transformer, highlighted in pink on the plan
-
PA26/04973 Granted
Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB
Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line
-
PA26/05516 Decided
Little Trethellan Trethellan Lanner Redruth Cornwall TR16 6BP
Notification of change of use under Class R from agricultural building to a flexible commercial use consisting of storage or distribution (Class B8) and offices (Class E)
-
PA26/04833 Granted
Shelton Farm Delabole Cornwall PL33 9DA
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ