Planning application
PA26/02698
Land To The South West Of St Erme House St Erme Cornwall
Proposal
Overhead Electricity Lines to alter the direction of a 11kv overhead line as per plan 5700617
As published by the council, reference PA26/02698
Timeline
Dates from the published record
-
22 Apr 2026
Received by Cornwall
-
28 May 2026
Decision issued: No objections (OHL/OHE/HG apps)
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About other applications
How this application type works
This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.
Nearby applications
Within 500 metres
-
PA26/03591 Decided
Street Record Eglos Road St Erme Cornwall
Proposed to undertake work that is considered to be exempted from the Electricity Act 1989 by falling within the Overhead Lines (Exemption) (England and Wales) Regulations 2009
-
PA25/06305 Granted
Land South Of Eglos Road Eglos Road St Erme Cornwall TR4 9BW
Residential development and associated access roads, landscaping and services without complying with condition 2 of decision PA23/04633 dated 16/08/2025
-
PA25/07709 Decided
Land At St Erme Truro TR4 9BW
Submission of details to Discharge Condition 3 (Surface Water Drainage) and Partial Discharge of Condition 4 (4a - Archaeological Site Investigation) in respect of Decision Notice PA24/06550 dated 19th June 2025
-
PA25/06946 Decided
Land At St Erme Truro TR4 9BW
Submission of details to discharge conditions 3 (CEMP), 4 (LEMP), 5a (Archelogy), 9 (Traffic Management Plan), 10 (Light Strategy), 16 (Tree Protection), 17 (BNG), 18 (Soft Landscaping) in relation to decision notice PA24/09949
-
PA25/08846 Granted
Land At St. Erme Truro TR4 9BW
Non-material amendment in relation to decision notice PA23/09949 dated 18/06/2025 for the omission of glazing bars from all windows, reduction in roof height by approximately one course, relocation of meter boxes to be external, raising of first-floor levels of Flats 19-22, increase of ridge height by 75mm for Flats 19-22, removal of rooflights for Flats 19-22, revision of porch design for Plots 15-16 and 32-33, change of stone material from natural stone to Wildstone stone slips, removal of stone plinth from Plots 8-10, change of walls below DPC on stone-clas plots from stone slips to buff bick, and updating of footpath material to the front of the houses.
-
PA25/07708 Decided
Land At St Erme Truro TR4 9BW
Submission of details to discharge condition 15 (Surface Water) in relation to Decision notice PA23/09949 dated 18/06/2025.
Other other applications
In Cornwall
-
PA26/04973 Awaiting decision
Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB
Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line
-
PA26/04833 Awaiting decision
Shelton Farm Delabole Cornwall PL33 9DA
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ
-
PA26/02728 Granted
Old Redmoor Mine Area Redmoor Road Callington Cornwall
Proposed mineral exploration drilling programme and associated developments involving drilling at 5 sites
-
PA26/04550 Awaiting decision
Land North Of West Langarth Farmhouse West Langarth Cornwall TR4 9AN
Overhead Electricity Lines application to raise the height of an existing overhead 11kv line as per plan 5894345
-
PA26/03364 Granted
Trewinnick Farm Trewinnick Tintagel Cornwall PL34 0HL
Install approximately 260mtrs of 11kV UG cable from pole 43LP7 to 45LP8 as shown on the attached plan 5853236s37. Add 43LP8 to network to create new terminal 11kV pole to support new overhead lines towards 43LP11 and connect to new UG cable from 43LP7. Replace pole 43LP11 and construct as a double terminal pole with addition of one new stay to have two stays on pole. Dismantle existing overhead line between 43LP7 and 43LP11 as shown highlighted blue on the attached plan and remove any redundant poles.