Planning application

Merrymeet Liskeard Cornwall PL14 3LS

Granted Cornwall PA26/02125 Overhead Electricity Lines

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Install a 3rd wire from pole 45YRA35 to 45YRA39 and from 45YRA38 to 45YRAF3 Replace poles 45YRAF1, 2 and 3 Install new lazy leg pole beside pole 45YRAF3 to support new upgraded pole mounted transformer Condition assess poles 45YRA35 to 45YRA39 and replace any poles if necessary as part of the same works Install new underground cable from 45YRAF3 to provide new electricity supplies on adjoining 3rd party land The total 3rd wire upgrade works are approximately 600mtrs of overhead line over 7 spans

As published by the council, reference PA26/02125

Application record

Reference
PA26/02125
Type
Overhead Electricity Lines
Status
Decided
Decision
Granted As published: No objections (OHL/OHE/HG apps)
Received
27 Mar 2026
Validated
27 Mar 2026
Decided
14 May 2026
Ward
St Cleer And Menheniot
Parish
Menheniot
Decision by
HoS Sign Off
Postcode
PL14 3LS

Timeline

Dates from the published record

  1. 27 Mar 2026

    Received by Cornwall

  2. 14 May 2026

    Decision issued: No objections (OHL/OHE/HG apps)

  3. 21 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cornwall granted permission on 14 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Butter Mill Cottages Merrymeet Liskeard Cornwall PL14 3LS

    PA26/00431/PREAPP Submitted 31 Mar 2026 100 yards away

    Pre-application advice for the conversion and extension of existing barn to a single dwelling house, including construction of new detached garage and associated works.

    Decided Outline Extension 9 docs
    Domestic
  • Butter Mill Cottages Merrymeet Liskeard Cornwall PL14 3LS

    PA26/04721 Submitted 12 Aug 2026 150 yards away

    95% historically approved · decision due ~7 Oct

    Conversion and extension of existing barn to a dwelling house, including construction of new detached garage and associated works

    Awaiting decision Full applications Extension 22 docs
    Domestic
  • The Old Barn Butterdon Mill Merrymeet Liskeard Cornwall PL14 3LS

    PA26/03368 Submitted 1 Jun 2026 150 yards away

    Application for a Lawful Development Certificate for Existing Use of The Old Barn as a dwellinghouse (Use Class C3)

    Granted Lawful development 14 docs
    Domestic
  • Butterdon Mill Barn Merrymeet Liskeard Cornwall PL14 3LS

    PA26/03361 Submitted 15 May 2026 150 yards away

    Application for discharge of planning obligation dated 28.08.1996 pursuant to decision 95/01105/F as the approved development was not implemented and has now expired

    Granted Conditions 7 docs
  • Butter Mill Cottages Merrymeet Liskeard Cornwall PL14 3LS

    PA25/09383 Submitted 12 Dec 2025 200 yards away

    Change of use of 12 C3 restricted bungalows to 12 unrestricted (open market) C3 residential dwellings

    Granted Full applications 30 docs
  • Barn 10 Treweatha Farm Merrymeet Liskeard Cornwall PL14 3LS

    PA25/06657 Submitted 9 Sep 2025 0.3 miles away

    Prior approval for change of use of agricultural building into a pair of semi detached dwellings and associated conversion works

    Granted Prior approval 14 docs

In Cornwall

  • PA26/06205 Awaiting decision

    Trenithon Farm Trenithon Lane Summercourt Newquay Cornwall TR8 5BJ

    Overhead Electricity Lines application to add a third wire to be erected on a section of existing high voltage network

    Received 7 Sep, published by the council 17 Sep 2026 Other
  • PA26/06019 Awaiting decision

    Treago Mill Treago Road Crantock Newquay Cornwall TR8 5QS

    NGED have received a connection request and three phase. To enable this connection there is a requirement to add a third wire to the overhead high voltage network from pole number 43AAE7 to 43AAF6, over 6 spans and a total of 381M, highlighted in green on the plan CE6038598SECT37. The existing high voltage overhead network from pole 43AAF6 to 43AAF8, over 2 spans and a total of 171M will be dismantled, highlighted in blue on the plan and replaced by an underground high voltage cable shown as the brown line on the plan. There is also a requirement to erect a lazy leg pole alongside pole number 43AAF8 to support the larger three phase transformer, highlighted in pink on the plan

    Received 28 Aug, published by the council 12 Sep 2026 Other
  • PA26/04973 Granted

    Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB

    Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line

    Received 16 Jul, published by the council 31 Jul 2026 Other
  • PA26/05516 Decided

    Little Trethellan Trethellan Lanner Redruth Cornwall TR16 6BP

    Notification of change of use under Class R from agricultural building to a flexible commercial use consisting of storage or distribution (Class B8) and offices (Class E)

    Received 7 Aug, published by the council 24 Aug 2026 Other
  • PA26/04833 Granted

    Shelton Farm Delabole Cornwall PL33 9DA

    -Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ

    Received 10 Jul, published by the council 21 Jul 2026 Other