Skip to content
PlanIndex Get alerts
Menu

Planning application

Webbs House The Tindle Suite The Parade Liskeard Cornwall PL14 6AH

Granted Cornwall PA26/01846 Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Listed building consent for internal alterations and minor external works to convert the ground floor and annex into a four surgery dental practice, including two ventilation louvres to the rear elevation

As published by the council, reference PA26/01846

Application record

Reference
PA26/01846
Type
Listed Building Consent
Status
Decided
Decision
Approved with conditions
Received
1 Apr 2026
Validated
1 Apr 2026
Decided
4 Jun 2026
Ward
Liskeard Central
Parish
Liskeard
Decision by
HoS Sign Off
Postcode
PL14 6AH

Site history

Applications at this address on the Cornwall register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • PA26/01845 Granted

    Webbs House The Tindle Suite The Parade Liskeard Cornwall PL14 6AH

    Internal alterations and minor external works to convert the ground floor and annex into a four surgery dental practice, including two ventilation louvres to the rear elevation

    Decided 4 Jun 2026 Full applications

Timeline

Dates from the published record

  1. 1 Apr 2026

    Received by Cornwall

  2. 4 Jun 2026

    Decision issued: Approved with conditions

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Newbury Design Limited Agent, a design practice registered in Plymouth

Active · incorporated 2021 · Plymouth

9 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Cornwall granted permission on 4 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Cornwall

  • PA26/05635 Awaiting decision

    Worthyvale Manor Slaughter Bridge Camelford Cornwall PL32 9TT

    Listed Building Consent for the increased width of stairwell. Additional staircase flight width in timber to match. Removal of first floor above kitchen. Installation of new glazing panel at first floor.

    Heritage and listed buildings
  • PA26/04960 Granted

    Flat A 4 Castle Street Liskeard Cornwall PL14 3AU

    Listed Building Consent for the replacement of the existing gutters and down pipes due to poor condition

    28 Jul 2026 Heritage and listed buildings
  • PA26/06012 Awaiting decision

    Spindrift Cottage East Cliff Lane Marazion Cornwall TR17 0AZ

    Listed Building Consent for the demolition and reconstruction of the sunroom and replacement south and east elevation render

    10 Sep 2026 Heritage and listed buildings
  • PA26/05909 Awaiting decision

    Tredinnick Barton Lanhydrock Bodmin Cornwall PL30 5AG

    Listed Building Consent for the replacement of rotten lintels throughout and remedial works to roof structure A-frames

    10 Sep 2026 Heritage and listed buildings
  • PA26/06080 Awaiting decision

    Mullion House Churchtown Mullion Helston Cornwall TR12 7HN

    Listed Buiding Consent Proposed restoration including replacement rear extension and garage to Grade II Listed property (householder)

    10 Sep 2026 Heritage and listed buildings