Planning application
PA26/01304
Four Cross Garage Four Cross Treluswell Penryn Cornwall TR10 9AN
Proposal
To add a third 11kv overhead wire to an existing line
As published by the council, reference PA26/01304
Timeline
Dates from the published record
-
25 Feb 2026
Received by Cornwall
-
1 Apr 2026
Decision issued: No objections (OHL/OHE/HG apps)
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About other applications
How this application type works
This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.
Nearby applications
Within 500 metres
-
PA25/05802 Granted
Redundant Stable Building Burnthouse St Gluvias Penryn Cornwall
Application for a Lawful Development Certificate for proposed completion of the conversion and modification of a redundant stable building into a residential dwelling and siting of a solar array, in accordance with the approved plans set out in decision PA22/03523 dated 10.11.2022 (confirmation of commencement of works)
-
PA21/06332 Granted
Land West Of Lower Gadles Burnthouse St Gluvias Penryn Cornwall TR10 9AS
Proposed demolition of two timber garden sheds and the erection of a dwelling together with associated works in the rear garden
-
PA26/04585 Awaiting decision
Gadles Farm Laity Moor Ponsanooth Truro Cornwall TR3 7HS
Provision of an earth banked slurry lagoon to support existing dairy enterprise.
-
PA26/00335 Granted
Vacant Land Four Cross Treluswell Cornwall
Variation of S.106 agreement in respect of PA24/04637 and PA25/04119 - construction of two affordable self build dwellings and asscoaited works, to reduce the discount percentage in accordance with a viability review.
Other other applications
In Cornwall
-
PA26/04973 Awaiting decision
Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB
Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line
-
PA26/04833 Awaiting decision
Shelton Farm Delabole Cornwall PL33 9DA
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ
-
PA26/02728 Granted
Old Redmoor Mine Area Redmoor Road Callington Cornwall
Proposed mineral exploration drilling programme and associated developments involving drilling at 5 sites
-
PA26/04550 Awaiting decision
Land North Of West Langarth Farmhouse West Langarth Cornwall TR4 9AN
Overhead Electricity Lines application to raise the height of an existing overhead 11kv line as per plan 5894345
-
PA26/03364 Granted
Trewinnick Farm Trewinnick Tintagel Cornwall PL34 0HL
Install approximately 260mtrs of 11kV UG cable from pole 43LP7 to 45LP8 as shown on the attached plan 5853236s37. Add 43LP8 to network to create new terminal 11kV pole to support new overhead lines towards 43LP11 and connect to new UG cable from 43LP7. Replace pole 43LP11 and construct as a double terminal pole with addition of one new stay to have two stays on pole. Dismantle existing overhead line between 43LP7 and 43LP11 as shown highlighted blue on the attached plan and remove any redundant poles.