Planning application
PA26/00633/PREAPP
Surfside Stores Mawgan Porth Hill Mawgan Porth Newquay Cornwall TR8 4BA
Proposal
Pre application for a single dwelling, 60-70sqm footprint, single story, requiring no foundation.
As published by the council, reference PA26/00633/PREAPP
Timeline
Dates from the published record
-
4 Jun 2026
Received by Cornwall
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Cornwall for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
PA26/01349 Granted
Sandy Beach House Mawgan Porth Hill Mawgan Porth Newquay Cornwall TR8 4BJ
Rear extension, internal renovations, gable extension and half-hipped roof to front with variation of Condition 2 of decision notice PA23/08724 dated 29/12/2023.
-
PA26/01015 Withdrawn
St Roche Mawgan Porth Hill Mawgan Porth Newquay Cornwall TR8 4BN
Demolition of existing buildings and construction of two dwellings
-
PA26/04448 Awaiting decision
Former Marver Holiday Park Mawgan Porth Newquay Cornwall TR8 4BB
Submission of details to discharge Condition numbers 3 (Surface Water), 4 (Archaeology), 5 (Evacuation Procedure), 11 (CTMP) and 13 (BNG) in respect of Decision Notice PA25/09627 dated 18/03/26 (Variation of Conditions 1 and 10 in respect of Decision Notice PA23/03371 dated 06/06/24)
-
PA25/09627 Granted
Former Marver Holiday Park Mawgan Porth Newquay Cornwall TR8 4BB
Variation of Conditions 1 and 10 in respect of Decision Notice PA23/03371 dated 6th June 2024
-
PA26/01482 Granted
Tamarisk Tredragon Road Mawgan Porth Newquay Cornwall TR8 4DJ
Extensions and alterations to dwelling, including side/rear extension to south east corner, basement addition, additions to the rear roof slope, landscaping to the rear garden, alterations to the driveway, addition of glass canopy over front door and a proposed bin store. (Alternative to planning permission PA25/01881)
-
PA25/08479 Granted
Land North West Of The Anchorage Tredragon Road Mawgan Porth Newquay TR8 4DJ
Construction of single detached residential property, including vehicular access, provision of external garden amenity area; and garden / bin store
Other outline applications
In Cornwall
-
PA26/05331 Awaiting decision
Land To The North Of Creaz-An Bre Foxhole St Austell Cornwall PL26 7SN
Application for Permission in Principle for the construction of up to 8 dwellings (minimum of 4, maximum of 8).
-
PA26/05318 Awaiting decision
Land North Of 13 Chapel Terrace St Blazey Cornwall PL24 2NL
Application for Permission in Principle for the construction of up to 1 dwelling (minimum of 1, maximum of 1)
-
PA26/05284 Awaiting decision
Land On The North Side Of Tros Mergh Penryn TR10 9LB
Application for Permission in Principle for between 2 and 3 dwellings (minimum of 2, maximum of 3)
-
PA26/05239 Awaiting decision
Three Meadows Church Coombe Redruth Cornwall TR16 6RT
Application for Permission in Principle for the construction of up to 2 dwellings (minimum of 1, maximum of 2)
-
PA26/05259 Awaiting decision
Land East Of Willow End Hobbacott Lane Marhamchurch Bude Cornwall
Application for Permission in Principle for the construction of up to 9 dwellings (minimum of 5, maximum of 9)