Planning application
PA26/00490
Millcombe Farm Herodsfoot Liskeard Cornwall PL14 4QX
Proposal
NGED are required to upgrade the existing low voltage overhead line at Herodsfoot, Cornwall as per the attached plan 5905474S37. As part of the low voltage upgrade works NGED are required to stand one new low voltage electricity pole as shown on the plan highlighted 'new pole'. The new pole is required to provide 4 new supplies and will be situated on private land agreed with the landowner. The overhead line shall be replaced with 4c 95mm aerial bundled conductor. The existing poles 451562-5, 451562-6, 451562-7, 451562-8, 451562-9 and 451562-11 shall all be replaced on a like for like basis as part of the upgrade works to ensure that the network is reliable and resilient. The tallest pole shall be 10.5 metres
As published by the council, reference PA26/00490
Timeline
Dates from the published record
-
26 Jan 2026
Received by Cornwall
-
5 Mar 2026
Decision issued: No objections (OHL/OHE/HG apps)
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About other applications
How this application type works
This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.
Nearby applications
Within 500 metres
-
PA21/01663/PREAPP Decided
Millcombe Farm Herodsfoot Liskeard Cornwall PL14 4QX
Pre application advice for Small scale residential development (one, small detached dwellinghouse) as a rounding off of the settlement;
-
PA26/00529 Decided
Millpool Head Herodsfoot Liskeard Cornwall PL14 4QX
Submission of details to discharge Conditions 4 - Water Pump and 9 - Contaminated Land - Remediation in respect of Decision Notice PA25/04135 dated 28.07.2025.
Other other applications
In Cornwall
-
PA26/04973 Awaiting decision
Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB
Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line
-
PA26/04833 Awaiting decision
Shelton Farm Delabole Cornwall PL33 9DA
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ
-
PA26/02728 Granted
Old Redmoor Mine Area Redmoor Road Callington Cornwall
Proposed mineral exploration drilling programme and associated developments involving drilling at 5 sites
-
PA26/04550 Awaiting decision
Land North Of West Langarth Farmhouse West Langarth Cornwall TR4 9AN
Overhead Electricity Lines application to raise the height of an existing overhead 11kv line as per plan 5894345
-
PA26/03364 Granted
Trewinnick Farm Trewinnick Tintagel Cornwall PL34 0HL
Install approximately 260mtrs of 11kV UG cable from pole 43LP7 to 45LP8 as shown on the attached plan 5853236s37. Add 43LP8 to network to create new terminal 11kV pole to support new overhead lines towards 43LP11 and connect to new UG cable from 43LP7. Replace pole 43LP11 and construct as a double terminal pole with addition of one new stay to have two stays on pole. Dismantle existing overhead line between 43LP7 and 43LP11 as shown highlighted blue on the attached plan and remove any redundant poles.