Planning application
PA25/09616
Keveral Barton Manor St Martin Cornwall PL13 1PA
Proposal
Prior notification of agricultural or forestry development for agricultural storage building.
As published by the council, reference PA25/09616
Timeline
Dates from the published record
-
22 Dec 2025
Received by Cornwall
-
16 Jan 2026
Decision issued: Prior approval not req'd(PA/AF/TEL/DEM/)
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
PA25/03004 Awaiting decision
Land At Keveral Gardens Seaton Torpoint PL11 3JH
'Variation of Condition 6 of decision PA17/04940 dated 14/11/2017 (Reserved matters application following outline approval 60/08425 for details of appearance, layout and scale in respect of 10 dwellings), amended by Application No. PA22/09936 dated 13th January 2023 (Non-material amendment in relation to decision notice PA17/04940 dated 14/11/2017 to provide condition on decision notice for amended plans)' without compliance with Condition 1 of decision notice PA23/04038 dated 18/02/2025.
-
PA25/06175 Granted
Land Pt Os 1552 Keveral Gardens Seaton Cornwall
Tree cutting clearance required for safety and access purposes to site. Replace pole 45DG36A and resite approximately 5 metres from existing pole to new position agreed with landowner. Replace pole-mounted transformer with new 100kVA 3-phase unit. Change pole 45DG36 and replace overhead line between 45DG36 and 45DG36A with 25mm HDC in 3-wire to make section 3-phase. Retain existing LV network and replace overhead lines with 4C 95 ABC (aerial bundled conductor). Tree cutting works to ensure trees are clear of existing OHLs between 45DG35-45DG37 and 45DG36-45DG36A.
Other prior approval applications
In Cornwall
-
PA26/05323 Awaiting decision
Blackdown Farm Lerryn Lostwithiel Cornwall PL22 0QP
Prior notification of agricultural or forestry development for: Concrete the farm yard
-
PA26/05293 Awaiting decision
Land At Tregarne Tregarne Manaccan Helston TR12 6EW TR12 6EW
Prior notification of agricultural or forestry development for: General purpose agricultural building
-
PA26/05308 Awaiting decision
Gang Land Bicton Road Pensilva Liskeard Cornwall PL14 5RF
Prior approval for change of use of agricultural building to a dwelling house including building operations necessary for the conversion
-
PA26/05243 Awaiting decision
Downs Farm Bell Lake Camborne Cornwall TR14 0JG
Prior notification of agricultural or forestry development for: Construction of steel-framed agricultural shed. (This application is for Building 2)
-
PA26/04635 Awaiting decision
National School Centre St Thomas Road Launceston Cornwall PL15 8BU
Prior approval for change of use from offices to 4 residential apartments.