Skip to content
PlanIndex Get alerts
Menu

Planning application

PA25/09612

Garages/Workshops Agnes Close Bude EX23 8SB

Awaiting decision Cornwall Outline Application

Proposal

Outline application for residential development of land for up to 1no dwellings with all matters reserved.

As published by the council, reference PA25/09612

Timeline

Dates from the published record

  1. 4 Mar 2026

    Received by Cornwall

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Cornwall for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • PA21/12622 Granted

    84 Treleven Road Bude EX23 8SA

    Two storey extension.

    21 Dec 2021 95m away Full applications
  • PA25/09326 Granted

    Land East Of 14 Traly Close Traly Close Bude Cornwall EX23 8TQ

    Permission in principle for residential construction (minimum 1 dwelling/maximum 2 dwellings)

    15 Dec 2025 200m away Outline
  • PA21/06213 Granted

    14 Traly Close Bude EX23 8TQ

    Proposed rebuild of dwelling. (Demolition of existing dwelling)

    11 Aug 2021 202m away Full applications
  • PA21/05530 Granted

    Bude Workspace Land At Bude Business Park Stratton Bude Cornwall EX23 8LY

    Construction of a building for B8; E(c)(iii); E(g)(i),(ii),(iii) Uses, together with the use of attenuation pond approved under PA15/02236 for surface water drainage

    28 Jun 2021 234m away Full applications
  • PA25/07935 Granted

    Land North Of Peak Performance Bude Stratton Business Park Stratton Bude Cornwall EX23 8LY

    Formation of padel tennis courts together with a general parking area

    10 Nov 2025 272m away Full applications
  • PA25/06377 Granted

    10 Binhamy Close Bude Cornwall EX23 8RX

    Creation of additional disabled entrance to the rear of the property replacing a rear window with a rear door with sidelight using existing lintel

    5 Sep 2025 292m away Full applications

In Cornwall

  • PA26/05331 Awaiting decision

    Land To The North Of Creaz-An Bre Foxhole St Austell Cornwall PL26 7SN

    Application for Permission in Principle for the construction of up to 8 dwellings (minimum of 4, maximum of 8).

    30 Jul 2026 Outline
  • PA26/05318 Awaiting decision

    Land North Of 13 Chapel Terrace St Blazey Cornwall PL24 2NL

    Application for Permission in Principle for the construction of up to 1 dwelling (minimum of 1, maximum of 1)

    30 Jul 2026 Outline
  • PA26/05284 Awaiting decision

    Land On The North Side Of Tros Mergh Penryn TR10 9LB

    Application for Permission in Principle for between 2 and 3 dwellings (minimum of 2, maximum of 3)

    29 Jul 2026 Outline
  • PA26/05239 Awaiting decision

    Three Meadows Church Coombe Redruth Cornwall TR16 6RT

    Application for Permission in Principle for the construction of up to 2 dwellings (minimum of 1, maximum of 2)

    28 Jul 2026 Outline
  • PA26/05259 Awaiting decision

    Land East Of Willow End Hobbacott Lane Marhamchurch Bude Cornwall

    Application for Permission in Principle for the construction of up to 9 dwellings (minimum of 5, maximum of 9)

    28 Jul 2026 Outline