Skip to content
PlanIndex Get alerts
Menu

Planning application

PA25/09581

Land At Higher Biscovillack Farm Greensplat St Austell Cornwall

Awaiting decision Cornwall Full application

Proposal

Single wind turbine along with associated works, equipment and necessary infrastructure including access track, crane pad, construction compound and underground cabling (accompanied by an environmental statement).

As published by the council, reference PA25/09581

Timeline

Dates from the published record

  1. 21 Jan 2026

    Received by Cornwall

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Cornwall for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • PA26/00697 Granted

    Goonvean Works Greensplat St Austell Cornwall PL26 8XY

    Proposed installation of a new 33kV overhead line (OHL) less than 2km in length on land between Bodmin Road and Greensplat Road, St Austell, (PL26 8XY), to facilitate the grid connection of consented wind turbines. The development comprises the construction of a new 33kV overhead distribution line, supported by a series of wood poles ranging in height from approximately 9m to 14.5m. The alignment has been designed to utilise land that is primarily characterised by previous industrial uses, including quarrying and mining activities, thereby minimising landscape and environmental effects where possible. The proposed OHL will connect the consented renewable energy generators to local distribution network and will follow a route selected to avoid visual impact, ecological and heritage constraints and respond appropriately to the sites established post-industrial character

    2 Feb 2026 488m away Other

In Cornwall

  • PA26/03823 Awaiting decision

    New County Hall Treyew Road Truro Cornwall TR1 3AY

    Relocation of Transformer to New County Hall from basement of existing building to new standalone unit within curtilage of NCH.

    29 Jun 2027 Full applications
  • PA26/05112 Awaiting decision

    29 United Road Carharrack Redruth Cornwall TR16 5QY

    Construction of a single storey front extension to the existing dwelling and associated works.

    30 Jul 2026 Full applications
  • PA26/05171 Awaiting decision

    1 Labernum Kilkhampton Bude Cornwall EX23 9QL

    Remove hip, add gable and dormer extension to form loft conversion

    29 Jul 2026 Full applications
  • PA26/05121 Awaiting decision

    Lower Trenowin Barn Ludgvan Penzance Cornwall TR20 8BL

    New extension and internal alterations to existing dwelling house

    29 Jul 2026 Full applications
  • PA26/03219 Granted

    Trefrida Farm Jacobstow Bude Cornwall EX23 0NZ

    Siting of slurry tank to support dairy enterprise

    1 Jun 2026 Full applications