Planning application
New Tiscott Farm Poughill Bude Cornwall EX23 9HL
Works: Extension Roofing Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of rear extension and new roof to existing dwelling, with change of cladding to existing house.
As published by the council, reference PA25/06856
Application record
- Reference
- PA25/06856
- Type
- Full application
- Status
- Decided
- Decision
- Approved with conditions
- Received
- 22 Sep 2025
- Validated
- 22 Sep 2025
- Decided
- 1 Dec 2025
- Ward
- Stratton, Kilkhampton And Morwenstow
- Parish
- Bude-Stratton
- Decision by
- Peer Sign Off
- Postcode
- EX23 9HL
Site history
Applications at this address on the Cornwall register
This site has had 3 applications since 2025: 3 approved, 0 refused.
-
PA26/01933 Granted
New Tiscott Farm Poughill Bude Cornwall EX23 9HL
Demolition of Existing dwelling , for a new house to be build in the same location with increase of 31 m2 in footprint.
-
PA25/09496 Granted
New Tiscott Farm Poughill Bude Cornwall EX23 9HL
Erection of rear extension and new roof to existing dwelling, with change of cladding to existing house with variation of Condition 2 of Decision Notice PA25/06856 dated 01.12.2025
Timeline
Dates from the published record
-
22 Sep 2025
Received by Cornwall
-
1 Dec 2025
Decision issued: Approved with conditions
-
21 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
PA25/09496 Granted
New Tiscott Farm Poughill Bude Cornwall EX23 9HL
Erection of rear extension and new roof to existing dwelling, with change of cladding to existing house with variation of Condition 2 of Decision Notice PA25/06856 dated 01.12.2025
Documents
Plans, drawings, consultee responses and the officer's report
22 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Cornwall granted permission on 1 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
New Tiscott Farm Poughill Bude Cornwall EX23 9HL
Erection of rear extension and new roof to existing dwelling, with change of cladding to existing house with variation of Condition 2 of Decision Notice PA25/06856 dated 01.12.2025
Granted Amendments Extension Roofing 11 docsDomestic -
New Tiscott Farm Poughill Bude Cornwall EX23 9HL
Demolition of Existing dwelling , for a new house to be build in the same location with increase of 31 m2 in footprint.
Granted Full applications Demolition 29 docsDomestic -
Hillcrest Stibb Road Bude Cornwall EX23 9HL
Permission in principle for maximum of 1 dwelling
Refused Outline 8 docsDomestic -
Hillcrest Stibb Road Bude Cornwall EX23 9HL
Rear extension and alterations to existing dwelling.
Granted Full applications Extension 7 docsDomestic -
Land South East Of Halls Farm Stibb Road Bude Cornwall EX23 9HN
Prior Notification for the construction of steel framed standard agricultural storage building
Granted Prior approval 3 docs -
North Park Halls Farm Stibb Road Bude Cornwall EX23 9HN
95% historically approved · decision due ~9 Oct
Construction of two agricultural covered yards and hard surfaced yard
Awaiting decision Full applications 7 docs
Other full applications
In Cornwall
-
PA26/04660 Granted
Sea Spirit Portuan Road West Looe Looe Cornwall PL13 2DN
Erection of a replacement ancillary garden room following the demolition of the former summer house.
-
PA26/06216 Awaiting decision
DP Engineering 1 Jon Davey Drive Treleigh Industrial Estate Redruth Cornwall TR16 4AX
Proposed new compound roof
-
PA26/06113 Awaiting decision
The Captains House Shutta Road East Looe Looe Cornwall PL13 1LU
Proposed timber cabin in the Captains House garden to provide auxiliary self-contained living accommodation for management staff of The Captains House Guest House
-
PA26/06184 Awaiting decision
37 Fore Street Torpoint Cornwall PL11 2AG
Application for the development of HMO from former pub building
-
PA26/04836 Granted
Wall Along South Side Of The Cliff The Cliff Mevagissey Cornwall
Partial demolition and like-for-like reconstruction of a bowed section of parapet wall adjacent to the highway and north of Harbour House, Mevagissey.