Planning application

The Old Vicarage And Nebb's Cottage Penarrow Road Mylor Churchtown Falmouth Cornwall TR11 5UD

Granted Cornwall PA25/06063 Full application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of replacement underfloor heating (UFH) & mechanical ventilation & heat recovery (MVHR) system, installation of ground floor solid fuel fires, replacement fire detection & alarm system, floor & floor covering changes, bathroom & WC refurbishments and rebuilding of gate piers & capstones (retrospective).

As published by the council, reference PA25/06063

Application record

Reference
PA25/06063
Type
Full application
Status
Decided
Decision
Approved with conditions
Received
3 Oct 2025
Validated
3 Oct 2025
Decided
16 Apr 2026
Ward
Mylor, Perranarworthal And Ponsanooth
Parish
Mylor
Decision by
Peer Sign Off
Postcode
TR11 5UD

Site history

Applications at this address on the Cornwall register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • PA25/06064 Granted

    The Old Vicarage And Nebb's Cottage Penarrow Road Mylor Churchtown Falmouth Cornwall TR11 5UD

    Listed building consent for the Installation of replacement underfloor heating (UFH) & mechanical ventilation & heat recovery (MVHR) system, installation of ground floor solid fuel fires, replacement fire detection & alarm system, floor & floor covering changes, bathroom & WC refurbishments and rebuilding of gate piers & capstones (retrospective).

    Decided 16 Apr 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 3 Oct 2025

    Received by Cornwall

  2. 16 Apr 2026

    Decision issued: Approved with conditions

  3. 21 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Cornwall granted permission on 16 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Cornwall

  • PA26/04660 Granted

    Sea Spirit Portuan Road West Looe Looe Cornwall PL13 2DN

    Erection of a replacement ancillary garden room following the demolition of the former summer house.

    21 Jul 2026 Full applications
  • PA26/06216 Awaiting decision

    DP Engineering 1 Jon Davey Drive Treleigh Industrial Estate Redruth Cornwall TR16 4AX

    Proposed new compound roof

    15 Sep 2026 Full applications
  • PA26/06113 Awaiting decision

    The Captains House Shutta Road East Looe Looe Cornwall PL13 1LU

    Proposed timber cabin in the Captains House garden to provide auxiliary self-contained living accommodation for management staff of The Captains House Guest House

    15 Sep 2026 Full applications
  • PA26/06184 Awaiting decision

    37 Fore Street Torpoint Cornwall PL11 2AG

    Application for the development of HMO from former pub building

    15 Sep 2026 Full applications
  • PA26/04836 Granted

    Wall Along South Side Of The Cliff The Cliff Mevagissey Cornwall

    Partial demolition and like-for-like reconstruction of a bowed section of parapet wall adjacent to the highway and north of Harbour House, Mevagissey.

    28 Jul 2026 Full applications