Skip to content
PlanIndex Get alerts
Menu

Planning application

PA25/05954

Land West Of The Cottage Trevenen Bal Helston Cornwall TR13 0PP

Refused Cornwall Permission in Principle

Proposal

Permission in Principle for construction of affordable led development of minimum 6 dwellings, maximum of 8

As published by the council, reference PA25/05954

Timeline

Dates from the published record

  1. 11 Sep 2025

    Received by Cornwall

  2. 16 Oct 2025

    Decision issued: Refused

  3. 21 Jul 2026

    Added to PlanIndex

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • PA21/05790 Granted

    Boderwennack Cottage Boderwennack Trevenen Bal Helston Cornwall TR13 0PR

    Renovation of Miners cottage, replacement of lean-to extension with two storey extension, construction of single vehicle garage adjacent to cottage, change of use of land to residential curtilage and replacement cess pit with septic tank/ soakaway

    25 Jun 2021 199m away Full applications
  • Seaview Cottage Trevenen Bal Helston Cornwall TR13 0PP

    Pre-application advice for the demolition of existing UPVC conservatory and construction of replacement solid structure.

    27 Oct 2025 213m away Outline
  • PA26/03126 Granted

    Seaview Cottage Trevenen Bal Helston Cornwall TR13 0PP

    Demolition of existing UPVC conservatory and construction of replacement solid structure

    7 May 2026 217m away Full applications
  • PA26/05059 Awaiting decision

    Seaview Cottage Trevenen Bal Helston Cornwall TR13 0PP

    Submission of details to discharge Condition 3 - Materials in respect of Decision Notice PA26/03126 dated 24.06.2026.

    20 Jul 2026 217m away Conditions
  • PA25/07005 Granted

    Higher Tremenheere Rowes Lane Trevenen Bal Cornwall TR13 0PP

    Roofing of livestock gathering area.

    15 Sep 2025 232m away Full applications

In Cornwall

  • PA26/05331 Awaiting decision

    Land To The North Of Creaz-An Bre Foxhole St Austell Cornwall PL26 7SN

    Application for Permission in Principle for the construction of up to 8 dwellings (minimum of 4, maximum of 8).

    30 Jul 2026 Outline
  • PA26/05318 Awaiting decision

    Land North Of 13 Chapel Terrace St Blazey Cornwall PL24 2NL

    Application for Permission in Principle for the construction of up to 1 dwelling (minimum of 1, maximum of 1)

    30 Jul 2026 Outline
  • PA26/05284 Awaiting decision

    Land On The North Side Of Tros Mergh Penryn TR10 9LB

    Application for Permission in Principle for between 2 and 3 dwellings (minimum of 2, maximum of 3)

    29 Jul 2026 Outline
  • PA26/05239 Awaiting decision

    Three Meadows Church Coombe Redruth Cornwall TR16 6RT

    Application for Permission in Principle for the construction of up to 2 dwellings (minimum of 1, maximum of 2)

    28 Jul 2026 Outline
  • PA26/05259 Awaiting decision

    Land East Of Willow End Hobbacott Lane Marhamchurch Bude Cornwall

    Application for Permission in Principle for the construction of up to 9 dwellings (minimum of 5, maximum of 9)

    28 Jul 2026 Outline