Planning application
PA25/05908
Barn At East Town Farm Carkeel Saltash Cornwall PL12 6NP
Proposal
Change of use of service pole 452461-2 from single service pole to a pole with LV mains connection (more than one service). Installation of one new service cable UG from pole 452461-2
As published by the council, reference PA25/05908
Timeline
Dates from the published record
-
4 Aug 2025
Received by Cornwall
-
16 Sep 2025
Decision issued: No objections (OHL/OHE/HG apps)
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About other applications
How this application type works
This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.
Nearby applications
Within 500 metres
-
PA25/01075/PREAPP Decided
Tavy View Carkeel Saltash Cornwall PL12 6NR
Pre application advice for change of use of existing stand alone building to an office for UK Wages
-
PA25/06114 Decided
The Ferns Carkeel Saltash Cornwall PL12 6NR
Submission of details to discharge condition 4 of decision notice PA23/01619 dated 25.08.2023.
-
PA26/04577 Decided
Street Record Carkeel Cornwall
Proposed to undertake work that is considered to be exempt from the Electricity Act 1989 by falling within the Overhead Lines (Exemption) (England and Wales) Regulations 2009
-
PA26/02036 Granted
The Annexe Tavy View Carkeel Saltash Cornwall PL12 6NR
Change of use of existing annex from C3 (dwellinghouse), to E(g)(i) (administrative office) to serve as the office for UK Wages, a local payroll business employing six members of staff.
-
PA26/01946 Awaiting decision
Sunnycourt Carkeel Saltash Cornwall PL12 6NR
Single Storey Two Bedroomed Detached Dwelling with two parking spaces; with two parking spaces also retained for the Existing Dwelling
Other other applications
In Cornwall
-
PA26/04973 Awaiting decision
Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB
Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line
-
PA26/04833 Awaiting decision
Shelton Farm Delabole Cornwall PL33 9DA
-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ
-
PA26/02728 Granted
Old Redmoor Mine Area Redmoor Road Callington Cornwall
Proposed mineral exploration drilling programme and associated developments involving drilling at 5 sites
-
PA26/04550 Awaiting decision
Land North Of West Langarth Farmhouse West Langarth Cornwall TR4 9AN
Overhead Electricity Lines application to raise the height of an existing overhead 11kv line as per plan 5894345
-
PA26/03364 Granted
Trewinnick Farm Trewinnick Tintagel Cornwall PL34 0HL
Install approximately 260mtrs of 11kV UG cable from pole 43LP7 to 45LP8 as shown on the attached plan 5853236s37. Add 43LP8 to network to create new terminal 11kV pole to support new overhead lines towards 43LP11 and connect to new UG cable from 43LP7. Replace pole 43LP11 and construct as a double terminal pole with addition of one new stay to have two stays on pole. Dismantle existing overhead line between 43LP7 and 43LP11 as shown highlighted blue on the attached plan and remove any redundant poles.