Proposal

-Install a 3rd wire between poles 45SCEF3 and 45SCEG8 (approximately 1150 metres) -Add a lazy leg pole at 45SCEG8 to support new 3 phase transformer -Relocate pole 45SCE7 approximately 15 metres further south from the tower line. This is to balance the span lengths either side of that pole. -Install a new mid span pole to be numbered 45SCEG1. This is required to maintain statutory ground clearance and shorten the existing span lengths. -Reconfigure pole 45SCEF8 and add one extra stay to act as an out of balance stay to keep pole supported and upright. -Replace 45SCEF2, 45SCEF3, 45SCEF4, 45SCEF5, 45SCEF6 & condition assess all other poles and if necessary change the poles whilst carrying out the 3rd wire works.

As published by the council, reference PA25/05635

Application record

Reference
PA25/05635
Type
Overhead Electricity Lines
Status
Decided
Decision
Granted As published: No objections (OHL/OHE/HG apps)
Received
24 Jul 2025
Validated
24 Jul 2025
Decided
29 Aug 2025
Ward
Saltash Trematon And Landrake
Parish
Landulph
Decision by
Peer Sign Off

Timeline

Dates from the published record

  1. 24 Jul 2025

    Received by Cornwall

  2. 29 Aug 2025

    Decision issued: No objections (OHL/OHE/HG apps)

  3. 21 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Cornwall granted permission on 29 August 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Poppyfields Church Lane Cargreen PL12 6NS

    PA21/02415 Submitted 6 Mar 2021 350 yards away

    Demolition of garaging/ office and construction of residential dwelling/ attached garage on same footprint (previously approved under PA20/00478 for conversion and change of use to form dwelling)

    Granted Full applications Demolition 20 docs
    Domestic
  • Poppyfields Church Lane Cargreen PL12 6NS

    PA21/02213 Submitted 2 Mar 2021 400 yards away

    Erection of domestic garage

    Granted Full applications 7 docs
  • Trenown Church Lane Cargreen Saltash Cornwall PL12 6NS

    PA21/03595 Submitted 2 Apr 2021 400 yards away

    Change of use of two buildings from offices to holiday unit (building A) and accommodation incidental/ancillary to host dwelling (building B)

    Granted Full applications 13 docs
    Domestic
  • Newlyn Church Lane Cargreen PL12 6NS

    PA21/03229 Submitted 25 Mar 2021 0.2 miles away

    Extension to dwelling including roof conversion

    Granted Full applications Extension 14 docs
    Domestic
  • Newlyn Church Lane Cargreen Saltash Cornwall PL12 6NS

    PA26/04519 Submitted 17 Jul 2026 0.2 miles away

    Non-material amendment in relation to decision notice PA21/03229 dated 21/07/2021, namely 1) Reduce bifold doors in guest room to 1m x 1m window and french doors on north west and north east elevations. 2) Reduce kitchen 3m bifold doors to 2m patio door. (north west & north east elevations proposed). 3) Increase kitchen window to 1m x 1m (north west & north east elevations proposed). 4) Change back door to French doors and to centralise along wall (south west and south east elevations proposed)

    Granted Amendments Windows or glazing 5 docs

In Cornwall

  • PA26/06205 Awaiting decision

    Trenithon Farm Trenithon Lane Summercourt Newquay Cornwall TR8 5BJ

    Overhead Electricity Lines application to add a third wire to be erected on a section of existing high voltage network

    Received 7 Sep, published by the council 17 Sep 2026 Other
  • PA26/06019 Awaiting decision

    Treago Mill Treago Road Crantock Newquay Cornwall TR8 5QS

    NGED have received a connection request and three phase. To enable this connection there is a requirement to add a third wire to the overhead high voltage network from pole number 43AAE7 to 43AAF6, over 6 spans and a total of 381M, highlighted in green on the plan CE6038598SECT37. The existing high voltage overhead network from pole 43AAF6 to 43AAF8, over 2 spans and a total of 171M will be dismantled, highlighted in blue on the plan and replaced by an underground high voltage cable shown as the brown line on the plan. There is also a requirement to erect a lazy leg pole alongside pole number 43AAF8 to support the larger three phase transformer, highlighted in pink on the plan

    Received 28 Aug, published by the council 12 Sep 2026 Other
  • PA26/04973 Granted

    Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB

    Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line

    Received 16 Jul, published by the council 31 Jul 2026 Other
  • PA26/05516 Decided

    Little Trethellan Trethellan Lanner Redruth Cornwall TR16 6BP

    Notification of change of use under Class R from agricultural building to a flexible commercial use consisting of storage or distribution (Class B8) and offices (Class E)

    Received 7 Aug, published by the council 24 Aug 2026 Other
  • PA26/04833 Granted

    Shelton Farm Delabole Cornwall PL33 9DA

    -Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ

    Received 10 Jul, published by the council 21 Jul 2026 Other