Planning application

Saddlers Wadebridge Cornwall PL27 7RZ

Granted Cornwall PA22/02485 Overhead Electricity Lines

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Western Power Distribution (WPD) to erect a lazy leg pole beside pole no. 43D124 to support a new pole mounted transformer. Existing transformer sited on pole 43D124A will be dismantled along with overhead span between the two afore-mentioned poles and stay wire on pole 43D124A. Underground LV and HV cables to be installed

As published by the council, reference PA22/02485

Application record

Reference
PA22/02485
Type
Overhead Electricity Lines
Status
Decided
Decision
No objections (OHL/OHE/HG apps)
Received
10 Mar 2022
Validated
10 Mar 2022
Decided
31 Mar 2022
Ward
Padstow
Parish
St. Issey
Decision by
Peer Sign Off
Postcode
PL27 7RZ

Timeline

Dates from the published record

  1. 10 Mar 2022

    Received by Cornwall

  2. 31 Mar 2022

    Decision issued: No objections (OHL/OHE/HG apps)

  3. 15 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Western Power Distribution Agent, registered in Brackley

Dissolved · incorporated 2022 · Brackley

8 applications on PlanIndex · across 4 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Cornwall granted permission on 31 March 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Cornwall

  • PA26/06019 Awaiting decision

    Treago Mill Treago Road Crantock Newquay Cornwall TR8 5QS

    NGED have received a connection request and three phase. To enable this connection there is a requirement to add a third wire to the overhead high voltage network from pole number 43AAE7 to 43AAF6, over 6 spans and a total of 381M, highlighted in green on the plan CE6038598SECT37. The existing high voltage overhead network from pole 43AAF6 to 43AAF8, over 2 spans and a total of 171M will be dismantled, highlighted in blue on the plan and replaced by an underground high voltage cable shown as the brown line on the plan. There is also a requirement to erect a lazy leg pole alongside pole number 43AAF8 to support the larger three phase transformer, highlighted in pink on the plan

    28 Aug 2026 Other
  • PA26/04973 Granted

    Truthan Manor Truthan St Erme Truro Cornwall TR4 9BB

    Overhead Electricity Lines application to add a 3rd wire to an existing 11kv overhead line

    16 Jul 2026 Other
  • PA26/05516 Decided

    Little Trethellan Trethellan Lanner Redruth Cornwall TR16 6BP

    Notification of change of use under Class R from agricultural building to a flexible commercial use consisting of storage or distribution (Class B8) and offices (Class E)

    7 Aug 2026 Other
  • PA26/04833 Granted

    Shelton Farm Delabole Cornwall PL33 9DA

    -Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination -Install new HV underground cable from 43LC4 to new H-Pole at 43LC5. -Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan -Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination -Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ

    10 Jul 2026 Other
  • PA26/05569 Awaiting decision

    Lower Tolcarne Farm St Allen Truro Cornwall TR4 9QX

    Overhead Electricity Lines to add a 3rd wire to an existing 11kv overhead line

    10 Aug 2026 Other