Planning application
1 River Street Portscatho Cornwall TR2 5HQ
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed rear extension and detached washroom
As published by the council, reference PA22/02374
Application record
- Reference
- PA22/02374
- Type
- Full application
- Status
- Decided
- Decision
- Approved with conditions
- Received
- 11 Mar 2022
- Validated
- 11 Mar 2022
- Decided
- 29 Apr 2022
- Ward
- St Goran, Tregony And The Roseland
- Parish
- Gerrans
- Postcode
- TR2 5HQ
Timeline
Dates from the published record
-
11 Mar 2022
Received by Cornwall
-
29 Apr 2022
Decision issued: Approved with conditions
-
15 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
CAD Architects Limited Agent, an architecture practice
23 applications on PlanIndex · across 4 councils · 89% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Cornwall granted permission on 29 April 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
3 Sunnyside Portscatho Cornwall TR2 5HJ
Proposed two storey extension and internal alterations
Granted Full applications Extension 10 docs -
Post Office 2 The Quay Portscatho TR2 5HF
Change of use of ground floor from retail to residential, and associated works
Refused Full applications 31 docs -
1 - 2 The Lugger Portscatho Truro Cornwall TR2 5HE
Works to Tree(s) within a Conservation Area (TCA) - T3 - Monterey Cypress and T2 and T4 - Scots Pine: Fell. T1 Monterey Cypress: no works.
Decided Trees 3 docs -
The Old Rocket Barn Wellington Terrace Portscatho Truro Cornwall TR2 5HN
The replacement of the existing pitched roof structure to the rear annexe with a room in the roof truss pitched roof to provide first floor accommodation, as previously approved under application PA20/11393, together with the provision of a roof dormer and revisions to the fenestration of the existing windows and doors.
Withdrawn Full applications Loft or dormer Windows or glazing 6 docs -
Curlew 28 North Parade Portscatho Truro Cornwall TR2 5HH
Proposed alteration and refurbishment works
Granted Full applications 8 docs -
Eshcol House 12 Clifton Terrace New Road Portscatho Truro Cornwall TR2 5HR
Proposed extension and alterations to existing Nursing Care Home to improve facilities and provide additional communal and office space
Granted Full applications Extension 18 docs
Other full applications
In Cornwall
-
PA26/04615 Granted
20-26Belmont Road St Austell Cornwall PL25 4UJ
Proposed replacement of communal doors
-
PA26/06053 Awaiting decision
Mingoose Vean Barn Towan Cross Mount Hawke Truro Cornwall TR4 8BX
Proposed first floor extension to form an additonal ensuite bedroom to the existing dwelling and alterations to the existing dwelling.
-
PA26/05043 Granted
35 Coffee Lake Meadow Lostwithiel Cornwall PL22 0LT
Construction of two storey rear extension, alterations to existing porch roof & associated internal refurbishment works.
-
PA26/04481 Granted
Blackthorn Cottage St Breward Bodmin Cornwall PL30 4NS
Construction of a conservatory and home office
-
PA26/01102 Granted
Land North Of St Minver Cricket Ground Menefreda Way St Minver Wadebridge Cornwall
Construction of 45 dwellings (including affordable housing), landscaping, open space, and associated infrastructure.