Planning application
PA21/12406
1 Sandsifters Boskerris Road Carbis Bay TR26 2NQ
Proposal
Application for a lawful development certificate for an existing development - two drainage inspection chambers have begun and been documented - approved under decision PA19/01906 (confirmation of a material start)
As published by the council, reference PA21/12406
Timeline
Dates from the published record
-
14 Dec 2021
Received by Cornwall
-
21 Feb 2022
Decision issued: Granted (CAADs, PIPs and LUs only)
-
31 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
PA25/05089 Refused
7 And 8 Azure Carbis Bay St Ives Cornwall TR26 2RW
Proposed certificate of lawfulness to removal a section of internal party wall between the two units, allowing for unified circulation and layout to create a single dwelling house.
-
PA26/02699 Granted
7 And 8 Azure Carbis Bay St Ives Cornwall TR26 2RW
Conversion of two dwellings to form one single dwelling house, construction of porch and associated works
-
PA25/08756 Decided
Land Adj To Cliff Cottage, Porthrepta Road, Carbis Bay TR26 2NN
Submission of details to discharge Conditions 2 materials and 3 Construction Method Statement in respect of Decision Notice PA24/04024 dated 08.08.2024
-
PA26/00193 Granted
Land Adj To Cliff Cottage Beach Road Carbis Bay Cornwall TR26 2NN
'Erection of a detached dwelling' without compliance of condition 2 of decision PA20/01326 dated 15/03/2021 with variation of conditions 1 and 2 of appeal decision notice APP/D0840/W/24/3352687 dated 17.02.2025 (following refusal notice PA24/04024 dated 08.08.2024).
-
PA26/00483 Granted
Trelawney Boskerris Road Carbis Bay St Ives Cornwall TR26 2NQ
Rear extension to dwelling and creation of new entrance door in existing window opening.
-
PA26/00481 Decided
Littlecote Porthrepta Road Carbis Bay St Ives Cornwall TR26 2LD
Submission of details to discharge Condition number 4 (Surface water drainage), 6 (Bats/birds/bee bricks) and 10 (Materials) in respect of Decision Notice PA25/04524 dated 19/11/25
Other lawful development applications
In Cornwall
-
PA26/05140 Awaiting decision
Chy-An-Nans Chy-An-Nans Lower Leha St Buryan TR19 6EJ
Certificate of lawful development for an existing use namely use of land as a residential caravan site
-
PA26/04926 Awaiting decision
North Cornwall Plumbing Supplies Ltd Atlantic Highway Services Stratton Bude Cornwall EX23 9JY
Application for a Lawful Development Certificate for a Proposed erection of a new steel frame storage shed
-
PA26/05102 Awaiting decision
Kings Arms 37 Fore Street Torpoint Cornwall PL11 2AG
Certificate of Lawfulness for the Existing use of first and second floors of the building to be used as houses in multiple occupation
-
PA26/04690 Awaiting decision
17 Springfield Park Mylor Bridge Falmouth Cornwall TR11 5SJ
Application for certificate of lawful development for a proposed use namely the erection of a single-storey conservatory at the rear.
-
PA26/05081 Awaiting decision
The Annexe 37 Boscaswell Village Pendeen Penzance Cornwall TR19 7EP
Certificate of Lawfulness for Existing Use for a detached annexe building. The annexe was constructed following the implementation of Planning Permis sion PA18/06948; however, the completed building differs in certain respects from the approved drawings.