Planning application
PA21/11126
Carnhot Cottage Carnhot Blackwater Truro Cornwall TR4 8HB
Proposal
Single storey, lean to, kitchen extension to existing dwelling
As published by the council, reference PA21/11126
Timeline
Dates from the published record
-
22 Nov 2021
Received by Cornwall
-
16 Feb 2022
Decision issued: Approved with conditions
-
31 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
PA26/02075 Awaiting decision
Land At Acland Farm Blackwater Truro Cornwall TR4 8HP
Excavation works to create an earth bunded slurry lagoon, fitted with liner and cover
-
PA21/05549 Granted
Land SE Of Grove Farm East Hill Blackwater Truro Cornwall TR4 8EG
Application for Outline Planning Permission with some matters reserved for the construction of a Detached Dwelling (Access and Layout only)
-
PA26/04434 Awaiting decision
Land SE Of Grove Farm East Hill Blackwater Cornwall TR4 8EG
Certificate of Lawful Development for a Proposed Use to confirm that works have commenced under Decision Notice PA23/04848 dated 20th October 2023 for the construction of single Infill dwelling and associated works The development was commence in June 2026 when the new vehicular access off the existing lane, which continued to the the newly created parking and turning area, formed at the correct levels.
-
PA26/04485 Awaiting decision
Land West Of Wheelgate Cottage Blackwater Truro Cornwall TR4 8EG
Application for Permission in Principle for the construction of up to 5 dwellings (minimum of 3, maximum of 5)
-
PA21/05745 Granted
Land To The East Of Holy Grove East Hill Blackwater Cornwall
Non material amendment for layout changes and replace lantoom stone with brown granite to PA19/02224
Other full applications applications
In Cornwall
-
PA26/03823 Awaiting decision
New County Hall Treyew Road Truro Cornwall TR1 3AY
Relocation of Transformer to New County Hall from basement of existing building to new standalone unit within curtilage of NCH.
-
PA26/05112 Awaiting decision
29 United Road Carharrack Redruth Cornwall TR16 5QY
Construction of a single storey front extension to the existing dwelling and associated works.
-
PA26/05171 Awaiting decision
1 Labernum Kilkhampton Bude Cornwall EX23 9QL
Remove hip, add gable and dormer extension to form loft conversion
-
PA26/05121 Awaiting decision
Lower Trenowin Barn Ludgvan Penzance Cornwall TR20 8BL
New extension and internal alterations to existing dwelling house
-
PA26/03219 Granted
Trefrida Farm Jacobstow Bude Cornwall EX23 0NZ
Siting of slurry tank to support dairy enterprise