Proposal
Proposed conversion of garage to annexe for holiday letting purposes
As published by the council, reference PA21/06362
Timeline
Dates from the published record
-
18 Jun 2021
Received by Cornwall
-
14 Feb 2022
Decision issued: Approved with conditions
-
31 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
PA25/07769 Granted
Kernick House Mill Road Bolingey Perranporth Cornwall TR6 0AP
Single storey extensions, replacement porch and loft conversion
-
PA26/00161 Withdrawn
Leatside Mill Road Bolingey Perranporth Cornwall TR6 0AP
Replacement dwelling with variation of Condition 3 of decision notice PA19/07952 dated 15/04/2020.
-
PA25/06584 Withdrawn
Ammophila Penwartha Road Bolingey Perranporth Cornwall TR6 0DH
Erection of a domestic garage
-
PA21/12265 Granted
Land At Former Nursery Penwartha Road Bolingey Cornwall
Proposed alterations and extension to existing portal framed agricultural building
-
PA25/07867 Granted
The Knap Quarry Road Bolingey Perranporth Cornwall TR6 0AS
Proposed cladding to all elevations of house and garage
-
PA25/09401 Granted
Trevellance Farm Trevellance Lane Bolingey Perranporth Cornwall TR6 0AX
Works to Trees covered by a Tree Preservation Order (TPO) - G1 - 3 x Ash on boundary - Remove dead wood from over bridle way only. T1 - Ash. Reduce Main Stem to crown break and retain as habitat in the interim. T5 - Ash - Fell to ground level. T6 - Elm - Fell to ground level. T7 - Elm - Fell to ground level. T8 - Ash - Remove primary branch over bridle way. T9 - Norway Maple - Fell to Ground level. T10 - Ash - Fell to Ground level and replant nearby. T11 - Sessile Oak - Remove dead stem over bridal way only. Leave habitat stub at safe length.
Other full applications applications
In Cornwall
-
PA26/03823 Awaiting decision
New County Hall Treyew Road Truro Cornwall TR1 3AY
Relocation of Transformer to New County Hall from basement of existing building to new standalone unit within curtilage of NCH.
-
PA26/05112 Awaiting decision
29 United Road Carharrack Redruth Cornwall TR16 5QY
Construction of a single storey front extension to the existing dwelling and associated works.
-
PA26/05171 Awaiting decision
1 Labernum Kilkhampton Bude Cornwall EX23 9QL
Remove hip, add gable and dormer extension to form loft conversion
-
PA26/05121 Awaiting decision
Lower Trenowin Barn Ludgvan Penzance Cornwall TR20 8BL
New extension and internal alterations to existing dwelling house
-
PA26/03219 Granted
Trefrida Farm Jacobstow Bude Cornwall EX23 0NZ
Siting of slurry tank to support dairy enterprise