Proposal
Loft conversion with dormer window and recessed balcony, removal of hip roof and construction of gable roof
As published by the council, reference PA21/05579
Timeline
Dates from the published record
-
26 May 2021
Received by Cornwall
-
28 Jan 2022
Decision issued: Approved with conditions
-
31 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
PA25/08027 Granted
106 Fore Street Newquay Cornwall TR7 1EY
Prior approval for change of use from commercial (Use Class E) to mixed use commercial and one dwelling (Use Classes E and C3)
-
PA26/01508 Granted
82 Fore Street Newquay Cornwall TR7 1EY
Replacement of existing retractable fabric awning with a new aluminium-framed retractable pergola/awning extending to the front railing
-
PA26/00748/PREAPP Awaiting decision
RNLI Lifeboat Station South Quay Hill Newquay Cornwall TR7 1HT
Pre application advice to build a small front extension which would lengthen the area in which the inland lifeboat is kept allowing it to always remain hitched. As part of the works the existing RNLI shop (located within the same building) would be removed and the space repurposed as a crew change area. As part of the works, the steps which access the Fishermens Mission next door would need to be moved to the front of the terrace / balcony, or potentially replaced with an access ramp if required.
-
PA25/08437 Refused
Land Adj To 1 King Edward Crescent Dane Road Newquay Cornwall TR7 1HL
Construction of a self/custom build townhouse to include an additional bedroom within the roof, in response to Appeal Decision APP/D0840/W/25/3361328.
-
PA25/07761 Granted
39 - 47 Fore Street Newquay Cornwall TR7 1HD
Change of use including external alterations of first floor redundant former restaurant to create 4 self-contained flats, together with conversion of existing second floor flat to create 3 self-contained flats. Removal of free-standing steel staircase to rear of the premises and construction of new communal stair enclosure to serve the proposed flats, together with ancillary improvement work.
-
PA26/00178 Granted
Newquay Golf Club Tower Road Newquay Cornwall TR7 1LT
Proposed balcony and associated works
Other full applications applications
In Cornwall
-
PA26/03823 Awaiting decision
New County Hall Treyew Road Truro Cornwall TR1 3AY
Relocation of Transformer to New County Hall from basement of existing building to new standalone unit within curtilage of NCH.
-
PA26/05112 Awaiting decision
29 United Road Carharrack Redruth Cornwall TR16 5QY
Construction of a single storey front extension to the existing dwelling and associated works.
-
PA26/05171 Awaiting decision
1 Labernum Kilkhampton Bude Cornwall EX23 9QL
Remove hip, add gable and dormer extension to form loft conversion
-
PA26/05121 Awaiting decision
Lower Trenowin Barn Ludgvan Penzance Cornwall TR20 8BL
New extension and internal alterations to existing dwelling house
-
PA26/03219 Granted
Trefrida Farm Jacobstow Bude Cornwall EX23 0NZ
Siting of slurry tank to support dairy enterprise