Skip to content
PlanIndex Get alerts
Menu

Planning application

Land On Gannel Road Gannel Road Newquay Cornwall

Granted Cornwall PA21/04732 Telecommunications Prior Notification

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior notification for the installation of a new 20.00m monopole supporting 6 no. antennas with a wrap around equipment cabinet at the base of the column.

As published by the council, reference PA21/04732

Application record

Reference
PA21/04732
Type
Telecommunications Prior Notification
Status
Decided
Decision
Prior approval not req'd(PA/AF/TEL/DEM/)
Received
4 May 2021
Validated
4 May 2021
Decided
11 Aug 2021
Ward
Newquay Trenance
Parish
Newquay
Decision by
Peer Sign Off

Timeline

Dates from the published record

  1. 4 May 2021

    Received by Cornwall

  2. 11 Aug 2021

    Decision issued: Prior approval not req'd(PA/AF/TEL/DEM/)

  3. 4 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a telecoms contractor registered in Leeds

324 applications on PlanIndex · across 97 councils · 84% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

  • 143 Mount Wise Newquay Cornwall TR7 1QW

    PA26/00759 Submitted 5 Feb 2026 93m away

    The conversion of the existing loft space incorporating a gable end extension. With the construction of a raised ground floor terrace to the rear, with associated alterations to external openings.

    Granted Full applications Extension 14 docs
  • 46 Stret Constantine Newquay TR7 1GH

    PA21/02449 Submitted 8 Mar 2021 112m away

    Construction of ground floor extension and associated works

    Granted Full applications Extension 6 docs
  • 168 Mount Wise Newquay Cornwall TR7 1QN

    PA22/01945 Submitted 23 Feb 2022 144m away

    Conversion of garage/outbuilding into office, W.C. and first floor studio

    Granted Full applications 12 docs
  • Meadow View 135 Mount Wise Newquay TR7 1QR

    PA21/08660 Submitted 29 Sep 2021 149m away

    Convert and extend cabin into a holiday let

    Granted Full applications 10 docs
  • Street Record Parc Godrevy Newquay Cornwall

    PA26/01808 Submitted 17 Mar 2026 192m away

    Proposed Upgrade to Electricity Substation permitted development in accordance with Part 15, Class B, of Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015

    Decided 5 docs
  • Allys Retreat 6 Atlantic Road Newquay Cornwall TR7 1QJ

    PA25/05833 Submitted 1 Aug 2025 205m away

    Non-material amendment in relation to decision notice PA24/06649 dated 25.10.2024 to remove the pitched dormer roof and balcony and create a recessed terrace area within the roof.

    Withdrawn Amendments Loft or dormer 5 docs

In Cornwall

  • PA26/03306 Granted

    Porthleven Transmitting Station West End Porthleven Cornwall TR13 9JL

    Telecommunication Prior Notification for permanent backup generator

    14 May 2026 Telecoms
  • PA26/03349 Granted

    Land North Of Manaccan Helston Cornwall TR12 6JG

    Prior notification of proposed development by telecommunications code system operators for a permanent backup generator.

    15 May 2026 Telecoms
  • PA26/02231 Granted

    Forrabury Common New Road Boscastle Cornwall PL35 0DJ

    Telecommunication Prior Notification for a permanent backup generator

    1 Apr 2026 Telecoms
  • PA26/01691 Granted

    Existing Base Station Uk-Co-000172, Driving Range Ivy Leaf Farm Bude Stratton EX23 9LD

    Telecommunication prior notification for proposed upgrade of an existing base station comprising the removal of an existing 15.0m monopole and replacement with a 20m lattice mast supporting 2 no BTEE / H3G antennas, 1 no 600mm dish together with ancillary development thereto

    12 Mar 2026 Telecoms
  • PA26/01119 Granted

    O2 Uk Ltd Communications Mast Cell 3823 Higher Bodieve Farm Bodieve Wadebridge Cornwall PL27 6ED

    Telecommunication prior notification for the proposed works comprise the removal of existing 15m monopole supporting 4 no. antennas, 3 no. equipment cabinets and the installation of a new 17.5m monopole supporting 4 no. antennas on an open headframe, 2 no. 300mm transmission dishes, 1 no. 600mm transmission dishes, 2 no. equipment cabinets and ancillary development there to including 18 no. Ericsson Radio Systems (ERSs).

    19 Feb 2026 Telecoms