Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Chilsworthy Beam Cottages Chilsworthy Gunnislake Cornwall PL18 9AT

Granted Cornwall PA21/03856 Full application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of glass conservatory and replacement with two storey extension to rear of house

As published by the council, reference PA21/03856

Application record

Reference
PA21/03856
Type
Full application
Status
Decided
Decision
Approved with conditions
Received
6 May 2021
Validated
6 May 2021
Decided
7 Jan 2022
Ward
Gunnislake And Calstock
Parish
Calstock
Decision by
HoS Sign Off
Postcode
PL18 9AT

Timeline

Dates from the published record

  1. 6 May 2021

    Received by Cornwall

  2. 7 Jan 2022

    Decision issued: Approved with conditions

  3. 4 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

2 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • The Stables Gnaton Barn Gunnislake PL18 9AT

    PA25/06180 Submitted 29 Aug 2025 61m away

    Proposed erection of self build dwelling and change of use of land to residential following planning permission PA24/07135

    Granted Full applications New dwelling 21 docs
    Domestic
  • River View Chilsworthy Gunnislake Cornwall PL18 9PB

    PA25/07980 Submitted 3 Nov 2025 255m away

    First Floor Extension

    Granted Full applications Extension 8 docs
  • Little Meadow Chilsworthy Cornwall

    PA26/04537 Submitted 5 Aug 2026 351m away

    98% historically approved · decision due ~30 Sep

    Proposed enlargement of bungalow with ground floor extension to side and rear and creation of a new first floor level in roof space with variation of Condition 2 of Decision Notice PA22/08651 dated 16.01.2023

    Awaiting decision Amendments Extension 3 docs
  • 1 Little Meadow Chilsworthy Gunnislake Cornwall PL18 9PB

    PA26/03805 Submitted 25 Jun 2026 362m away

    Extension sunroom to rear of property

    Granted Full applications Extension 13 docs
  • Valley Lodge Delaware Road Drakewalls Gunnislake Cornwall PL18 9AS

    PA24/06716 Submitted 16 Jun 2025 408m away

    Retention of open fronted timber and log storage, double car port and a garden stores and garden landscaping works and retrospective change of use of land to residential curtilage.

    Granted Full applications 23 docs
  • Land South Of Philcrist Chilsworthy Gunnislake Cornwall PL18 9PB

    PA22/00958 Submitted 2 Feb 2022 420m away

    Non Material Amendment in relation to Decision Notice PA19/04289 dated 02.08.2019: to use the existing driveway rather than the one shown on the approved plans.

    Granted Amendments 3 docs

In Cornwall

  • PA25/03275 Granted

    Land North East Of The Lamb And Flag Canonstown Cornwall TR27 6LU

    Construction of 11 dwellings and associated works (affordable and open market)

    26 Jun 2025 Full applications
  • PA26/05242 Granted

    Land Off Crown Terrace Whitemoor St Austell PL26 7XJ

    Technical Details Consent (TDC) following Permission In Principal approval PA25/09474 dated 17.03.26 for a single detached self-build dwelling

    28 Jul 2026 Full applications
  • PA26/05387 Awaiting decision

    Land At Chyvogue Lane Perranwell Station Truro Cornwall TR3 7JX

    Application for Technical Details Consent (TDC) following Permission in Principle approval PA25/07669 dated 17.11.2025 for construction of 5 detached open-market dwellings

    27 Aug 2026 Full applications
  • PA26/05917 Awaiting decision

    Ropers Walk Farm Rope Walk Mount Hawke Truro Cornwall TR4 8DW

    Application for use of The Byre and The Cornstore not in compliance with conditions 4, 10 and 11 of C1/PA25/1506/05B and change of use of land adjacent to residential gardens

    27 Aug 2026 Full applications
  • PA26/05457 Awaiting decision

    Boswidjack Farm Tucoyse Lane Higher Brill Constantine Falmouth Cornwall TR11 5QQ

    The construction of an agricultural building to form part of a milking parlour complex (collecting and dispersal yards) (P3)

    27 Aug 2026 Full applications