Planning application
Min Y Don Bowling Club Min Y Don Road Old Colwyn Colwyn Bay Conwy LL29 9SD
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of a 5000L water tank and fence to screen the tank as part of an irrigations system to effectively water the bowling green
As published by the council, reference 0/53638
Application record
- Reference
- 0/53638
- Type
- Full
- Status
- Pending As published: REGISTERED
- Received
- 17 Aug 2026
- Validated
- 1 Sep 2026
- Ward
- Eirias
- Parish
- Cyngor Tref Colwyn Town Council
- Decision by
- Case Officer
- Postcode
- LL29 9SD
Timeline
Dates from the published record
-
17 Aug 2026
Received by Conwy
-
1 Sep 2026
Validated
Checked as complete and ready for consideration.
-
6 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Conwy took a median of 73 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Conwy for determination, against a statutory target of eight weeks. Over the last year Conwy decided full applications in a median of 83 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Church In The Park Berthes Road Old Colwyn Colwyn Bay Conwy LL29 9SD
As specified in accompanying report: To crown reduce by 2.5m in height and 3m in crown radius and remove deadwood over 35mm and minor broken branches.
Granted Trees 5 docs -
47 Beach Road Old Colwyn Colwyn Bay Conwy LL29 9PH
To prune 1 no sycamore tree and 1 no oak tree
Granted Trees 4 docs -
-
19 Station Road Old Colwyn Colwyn Bay LL299PW
Remove 4 trees and 1 no. hedge and crown lift 1 no. Sycamore and 1 no. Leylandii
Withdrawn Trees 4 docs -
Green Bank Cottage 19 Station Road Old Colwyn Colwyn Bay Conwy LL29 9PW
Variation of conditon no 2 of plannig approval 0/51199 (Alterations and extension to existing dwelling and formation of new vehicular access to provide off road parking Construction of detached summer house/garden store outbuilding) to allow for changes to approved plans
Granted Full applications Extension 10 docsSmall domestic -
19 Station Road Old Colwyn Colwyn Bay LL299PW
Remove 1 tree and crown lift 3 trees
Granted Trees 4 docs
Other full applications
In Conwy
-
0/53489 Granted
Bryn Hafod Llethr Gwytherin Abergele LL22 8YF
This is the resubmission of 0/52999 - Refurbishment of 3 adjoining derelict barns and conversion to ancillary family accommodation; partial demolition and rebuild of one barn on advice of structural engineer; raising a roof by 800mm to accommodate 1st floor; repointing and repair of original stonework; addition of new windows and skylights; upgrading 2 roofs finishes to slate.
-
0/53636 Granted
61 B Conway Road Colwyn Bay LL29 7LG
Variation of Condition no.2 of Planning Approval 0/52534 (PROPOSED CONVERSION OF EXISTING GARAGE/OFFICE SPACE TO ANNEX AND PROPOSAL OF A SINGLE STOREY REAR EXTENSION) to allow for changes to approved plans.
-
0/53572 Granted
Neuadd Y Plwyf Llanefydd Llanefydd Conwy LL16 5EA
Installation of a shipping container for storing equipment from the village hall
-
0/53556 Granted
Sheraton West Parade Llandudno LL30 2BD
Proposed Extensions & Alterations, and Garage Extension
-
0/53597 Granted
Welsh Assembly Government Buildings Sarn Mynach Llandudno Junction LL31 9RZ
Installation of Battery Energy Storage System (BESS) units, including associated enclosure, infrastructure and ancillary works.