Skip to content
PlanIndex Get alerts
Menu

Planning application

West Winds 72 Deganwy Road Deganwy LL31 9DN

Awaiting decision Conwy 0/53619 Full

Works: Extension Loft or dormer Roofing Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed extensions and alterations to dwelling including rear extension, roof alterations and dormers, balcony, replacement windows and doors, external material alterations, rooflights, alterations to vehicular access and associated landscaping and biodiversity enhancements.

As published by the council, reference 0/53619

Application record

Reference
0/53619
Type
Full
Status
REGISTERED
Received
7 Aug 2026
Validated
25 Aug 2026
Ward
Deganwy
Parish
Cyngor Tref Conwy Town Council
Postcode
LL31 9DN

Timeline

Dates from the published record

  1. 7 Aug 2026

    Received by Conwy

  2. 25 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Conwy took a median of 72 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Conwy for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 10 Rockfield Drive Llanrhos Llandudno LL30 1PF

    0/48586 Submitted 10 Jun 2021 86m away

    Proposed loft conversion and extension to existing dormer and creation of parking area to front of dwelling.

    Granted Full applications Extension Loft or dormer 15 docs
    Domestic
  • 16 Traeth Melyn Deganwy LL31 9DP

    0/48686 Submitted 9 Jul 2021 121m away

    Proposed Rear Extension & Garage Conversion

    Granted Full applications Extension 9 docs
  • The Moorings 11 Penlan Llanrhos Llandudno LL30 1PE

    0/50412 Submitted 16 Dec 2022 125m away

    Proposed raised decking to rear and fencing to the side to provide security.

    Granted Full applications 18 docs
  • 26 Rockfield Drive Llanrhos Llandudno Conwy LL30 1PF

    0/52041 Submitted 3 Oct 2024 125m away

    Non Material Amendment to planning approval 0/50426 (Proposed loft conversion with new raised roof & dormers with balconies to front, proposed new rear & side extensions and proposed extended driveway to front. Proposed two new windows at ground floor level to gable end.) to allow for 3 No additional rooflights.

    Granted Amendments Extension Loft or dormer +1 8 docs
  • 26 Rockfield Drive Llanrhos Llandudno LL30 1PF

    0/50426 Submitted 31 Jan 2023 125m away

    Proposed loft conversion with new raised roof & dormers with balconies to front, proposed new rear & side extensions and proposed extended driveway to front. Proposed two new windows at ground floor level to gable end.

    Granted Full applications Extension Loft or dormer +1 22 docs
  • 13 Penlan Llanrhos Llandudno LL30 1PE

    0/53188 Submitted 3 Feb 2026 131m away

    Garage Conversion with Extension to connect to existing dwelling and window in side elevation for new bedroom

    Granted Full applications Extension Windows or glazing 19 docs
    Small domestic

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications