Skip to content
PlanIndex Get alerts
Menu

Planning application

Islwyn 8 St Agnes Road Conwy LL32 8RY

Granted Conwy 0/53044 Full

Works: Extension Windows or glazing

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

The removal of an existing conservatory and chimney, installation of new windows, and bi-folding doors, and internal alterations Existing - red brickwork, off white render, roofing tiles, timber windows and doors Proposed - timber windows and doors to match the existing.

As published by the council, reference 0/53044

Application record

Reference
0/53044
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
13 Oct 2025
Validated
8 Dec 2025
Decided
21 Jan 2026
Ward
Conwy
Parish
Cyngor Tref Conwy Town Council
Decision by
Case Officer
Postcode
LL32 8RY

Timeline

Dates from the published record

  1. 13 Oct 2025

    Received by Conwy

  2. 8 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jan 2026

    Decision issued: Approved With Conditions

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 15 Ty Gwyn Gardens Conwy LL32 8RA

    0/52851 Submitted 16 Sep 2025 52m away

    Proposed construction of single storey extension to front of dwelling and demolition of garden room and balcony to allow for construction of 2 storey extension with pitched roof with adjoining single storey extension with flat roof.

    Granted Full applications Extension Demolition 8 docs
    Small domestic
  • Bryn Ffynnon 1 Bryn Ffynnon, Old Road Conwy LL32 8PN

    0/52773 Submitted 14 Aug 2025 84m away

    Extension to south facing elevation (Listed Building Consent)

    Granted Heritage and listed buildings Extension 18 docs
  • Ty'N Yr Ardd St Agnes Road Conwy LL32 8RY

    0/47372 Submitted 4 Jun 2020 89m away

    Non material amendment to planning consent 0/45862 (Demolition of existing dwelling and construction of two new dwellings with associated vehicular access and car-parking.) to allow for change to the foul drainage to a new treatment plant.

    Withdrawn Amendments New dwelling Demolition 10 docs
    Several homes
  • Ty'n Yr Arddn St Agnes Road Conwy LL32 8RY

    0/46422 Submitted 14 Jun 2019 89m away

    Approval of matters required by condition no 3 of planning approval 0/45862 (Demolition of existing dwelling and construction of two new dwellings with associated vehicular access and car-parking)

    Granted Conditions New dwelling Demolition 7 docs
    Several homes
  • Bryn Sychnant Pass Road Conwy LL32 8NS

    0/50378 Submitted 11 Jan 2023 98m away

    Approval of matters required by condition no 4 (Render) of planning consent 0/49975 (Variation of condition no.4 of planning consent 0/48665 (Change of use of existing outbuilding into holiday accommodation) to allow for the existing walls to be finished with a breathable lime render.)

    Granted Conditions 10 docs
  • Can Yr Afon Mount Pleasant Conwy LL32 8PD

    0/50414 Submitted 19 Jan 2023 103m away

    Gable roof to rear element of the building to provide additional usable headroom within the property.

    Granted Full applications 18 docs

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications