Skip to content
PlanIndex Get alerts
Menu

Planning application

Pentre Mawr Park, The Clubhouse Dundonald Avenue Abergele LL22 7AZ

Awaiting decision Conwy 0/53007 Full

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Extension to the existing Club house to provide 2 new changing rooms along with showering facilities, a second ref room, communal toilets and separated the bar/kitchen to improve facilities.

As published by the council, reference 0/53007

Application record

Reference
0/53007
Type
Full
Status
REGISTERED
Received
27 Oct 2025
Validated
25 Nov 2025
Ward
Pen-sarn Pentre Mawr
Parish
Cyngor Tref Abergele Town Council
Decision by
Case Officer
Postcode
LL22 7AZ

Timeline

Dates from the published record

  1. 27 Oct 2025

    Received by Conwy

  2. 25 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 20 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Conwy took a median of 72 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

27 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Conwy for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land surrounding the stone circles in Pentre Mawr Park Abergele Conwy LL22 7LX

    0/51993 Submitted 12 Sep 2024 0m away

    Construction of two Cycle tarmac Pump Track with undulating hills. Two tracked areas serving different age groups, associated drainage, landscaping and low level boundary enclosure.

    Granted Full applications 32 docs
  • Land surrounding the stone circles in Pentre Mawr Park Abergele Conwy LL22 7LX

    0/52790 Submitted 12 Aug 2025 0m away

    Non Material Amendment to Planning Approval 0/51993 (Construction of two Cycle tarmac Pump Track with undulating hills. Two tracked areas serving different age groups, associated drainage, landscaping and low level boundary enclosure.) to allow for amended plans.

    Granted Amendments 5 docs
  • 64 Sea Road Abergele LL22 7LU

    0/53444 Submitted 20 May 2026 256m away

    Variation of condition no 2 of planning approval 0/53313 (Proposed rear extension and infill front extension) to allow for changes to approved plans

    Granted Full applications Extension 10 docs
  • 64 Sea Road Abergele LL22 7LU

    0/53313 Submitted 24 Mar 2026 256m away

    Proposed rear extension and infill front extension

    Granted Full applications Extension 12 docs
  • Min Y Coed 2 Kinmel Avenue Abergele LL22 7LW

    0/52723 Submitted 4 Aug 2025 311m away

    90% historically approved · decision due ~1 Oct

    Approval of condition no 11 (Drainage Strategy Details) of planning approval 0/52422 (Demolition of existing bungalow and erection of three, 2.5 storey townhouses with associated drainage, access and landscaping works)

    Awaiting decision Conditions Demolition 6 docs
  • Rhoslan Alexandra Road Abergele LL22 7LS

    0/53348 Submitted 9 Apr 2026 314m away

    Proposed ground floor extensions to front and rear, alteration to roof from hip to gable and new roof dormer to rear elevation

    Granted Full applications Extension Loft or dormer +1 11 docs

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications