Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Branwen, Tir Llwyd Industrial Estate, Kinmel Bay, LL18 5JA

Granted Conwy 0/52881 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Change of use from B1/B8 industrial to D2 Padel Tennis Centre

As published by the council, reference 0/52881

Application record

Reference
0/52881
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
16 Sep 2025
Validated
10 Oct 2025
Decided
25 Feb 2026
Ward
Kinmel Bay
Parish
Cyngor Tref Towyn a Bae Cinmel Town Council
Decision by
DC East Team Leader
Postcode
LL18 5JA

Timeline

Dates from the published record

  1. 16 Sep 2025

    Received by Conwy

  2. 10 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 25 Feb 2026

    Decision issued: Approved With Conditions

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Unit 37 and 38 Tir Llwyd Industrial Estate Kinmel Bay LL18 5JA

    0/53623 Submitted 30 Jul 2026 132m away

    86% historically approved · decision due ~21 Oct

    Proposed change of use from Class B8 (Storage and Distribution) to Class D2 (Assembly and Leisure) to facilitate a gym, bodybuilding and fitness facility, including ancillary health, rehabilitation and wellbeing facilities.

    Awaiting decision Full applications 15 docs
  • Snownest Court Tir Llwyd Industrial Estate Kinmel Bay LL18 5JY

    0/53061 Submitted 25 Nov 2025 172m away

    Proposed Industrial Unit to accommodate Office Space and Storage Space

    Granted Full applications 27 docs
  • Bayford Cambria Oil Tir Llwyd Enterprise Park Kinmel Bay Conwy LL18 5JH

    0/47323 Submitted 5 May 2020 227m away

    Demolition of 7 no. storage tanks and all associated pipeworks and block work bund wall, 1 no. bottom loading skid and all associated pipework, 2 no. off loading cabinet and all associated pipework, 1 no. interceptor and all associated loading and off loading equipment

    Refused Prior approval Demolition 20 docs
  • Land off Tir Llwyd Enterprise Park, Kinmel Bay. LL18 5JH

    0/47274 Submitted 15 Apr 2020 227m away

    Change of use to secure individual open air storage and yard compound facilities

    Refused Full applications 15 docs
  • North Wales Garden Centre St Asaph Avenue Kinmel Bay LL18 5TU

    0/48753 Submitted 22 Jul 2021 354m away

    New Vehicle Entrance

    Withdrawn Full applications 14 docs
  • North Wales Garden Centre St Asaph Avenue Kinmel Bay LL18 5TU

    0/53065 Submitted 25 Nov 2025 354m away

    Erection of extension to existing cafe (ancillary to the Garden Centre), erection of toilet block, cladding of existing glasshouse walls and roof, creation of new entrance and implementation of a one way syster for customers, together with internal car park layout improvements including erection of electric car charging points.

    Granted Full applications Extension 26 docs

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications