Planning application
1 Heather Close Old Colwyn Colwyn Bay LL29 9DW
Works: Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Existing private dwelling, new galvanised steel balcony to the front elevation, front and sides to be rendered with a self coloured render, new picture window to front elevation
As published by the council, reference 0/52100
Application record
- Reference
- 0/52100
- Type
- Full
- Status
- FINAL DECISION
- Decision
- Approved With Conditions
- Received
- 12 Aug 2024
- Validated
- 4 Nov 2024
- Decided
- 18 Dec 2024
- Ward
- Colwyn
- Parish
- Cyngor Tref Colwyn Town Council
- Decision by
- Case Officer
- Postcode
- LL29 9DW
Timeline
Dates from the published record
-
12 Aug 2024
Received by Conwy
-
4 Nov 2024
Validated
Checked as complete and ready for consideration.
-
18 Dec 2024
Decision issued: Approved With Conditions
-
7 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Garages site Sefton Road Old Colwyn Colwyn Bay LL29 9BP
Variation of conditions 2, 8 & 9 of planning consent 0/45766 (Demolition of existing garages, erection of eight residential units, associated parking and landscaping.) to allow for amendments to the wording of conditions
Granted Full applications Demolition 23 docs -
The Victoria Club 426 Abergele Road Old Colwyn Colwyn Bay LL29 9AB
Change of use from a social club (Sui Generis) into C2 children's home
Refused Full applications 23 docs -
426 Abergele Road Old Colwyn Colwyn Bay LL29 9AB
Change of use from a social club (D2) into five residential apartments (C3 use class) to be provided as 100% affordable units, along with associated works for external alterations, parking provision, accessible pedestrian access and landscaping works.
Withdrawn Full applications New dwelling 22 docs -
Villalee 35 Llysfaen Road Old Colwyn Colwyn Bay LL29 9HB
Proposed internal alterations to form first floor dormer window and french doors in lieu of window
Granted Full applications Loft or dormer Windows or glazing 12 docs -
37 Llysfaen Road Old Colwyn Colwyn Bay LL29 9HB
Proposed balcony over existing flat roof at rear of dwelling
Granted Full applications 8 docsDomestic -
40 Endsleigh Road Old Colwyn Colwyn Bay LL29 9EA
Variation of condition no 2 of planning consent 0/37020 (Erection of 10 no. apartments and construction of means of access (approval of reserved matters approved under code ref: 0/33224 ) granted on appeal to allow for amendments to design and materials
Refused Full applications New dwelling 17 docsMajor scheme
Other full applications applications
In Conwy
-
0/52696 Granted
Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY
Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd
-
0/53549 Refused
2 A Mostyn Street Llandudno LL30 2PS
Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)
-
0/53528 Refused
Riviera 13 Arvon Avenue Llandudno LL30 2DY
Change of use from guest house (C1) to a single dwellinghouse (C3)
-
0/53502 Granted
15 Maes Rhun Tyn Y Groes Conwy LL32 8PA
Erection of side/rear extension, with infill, part conversion of existing garage
-
0/53550 Granted
60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP
Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.