Planning application
Vyrnwy Alexandra Park Penmaenmawr Conwy LL34 6YH
Works: Windows or glazing
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Replace existing white painted timber windows with new white UPVC windows in exisitng openings (Permitted Development Works Withdrawn by the Penmaenmawr Conservation Area Article 4)
As published by the council, reference 0/52069
Application record
- Reference
- 0/52069
- Type
- Approval Required by Article 4 Direction
- Status
- FINAL DECISION
- Decision
- Approved With Conditions
- Received
- 18 Oct 2024
- Validated
- 24 Oct 2024
- Decided
- 12 Dec 2024
- Ward
- Penmaenmawr
- Parish
- Cyngor Tref Penmaenmawr Town Council
- Decision by
- DC West Team Leader
- Postcode
- LL34 6YH
Timeline
Dates from the published record
-
18 Oct 2024
Received by Conwy
-
24 Oct 2024
Validated
Checked as complete and ready for consideration.
-
12 Dec 2024
Decision issued: Approved With Conditions
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Conwy is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Vyrnwy Alexandra Park Penmaenmawr LL34 6YH
Non Material Amendment to Planning Approval 0/52069 (Replace existing white painted timber windows with new white UPVC windows in exisitng openings (Permitted Development Works Withdrawn by the Penmaenmawr Conservation Area Article 4)) to allow for changes to windows
Refused Amendments Windows or glazing 6 docs -
Llus Fynydd Alexandra Park Penmaenmawr LL34 6YH
Installation of 27 no. solar panels to roof
Granted Full applications 24 docs -
Bryn Mair Alexandra Park Penmaenmawr Conwy LL34 6YH
Prune two no branches and remove two no dead branches to Oak Tree
Granted Trees 8 docs -
Tegfan Alexandra Park Penmaenmawr LL34 6YH
Installation of Replacement Windows (Permitted Development Works Withdrawn by the Penmaenmawr Conservation Area Article 4)
Granted Full applications Windows or glazing 16 docs -
Tegfan Alexandra Park Penmaenmawr LL34 6YH
To fell one cupressus macrocarpa and one prunus avium within the boundary of Tegfan, Alexandra Park, Penmaenmawr, sited within Pen-Y-Cae Penmaenmawr conservation area.
Granted Trees 6 docs -
Trelystan Alexandra Park Penmaenmawr LL34 6YH
To prune 1 no. beech tree and reduce 1 no. hazel hedge.
Granted Trees 4 docs