Skip to content
PlanIndex Get alerts
Menu

Planning application

Birchwood 53 Overlea Avenue Deganwy LL31 9TD

Granted Conwy 0/51925 Full

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Change of use from C2 to C3 Residential dwelling including alterations to form a rear extension, new access and double garage.

As published by the council, reference 0/51925

Application record

Reference
0/51925
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
14 Aug 2024
Validated
28 Aug 2024
Decided
21 Oct 2024
Ward
Glyn y Marl
Parish
Cyngor Tref Conwy Town Council
Decision by
DC West Team Leader
Postcode
LL31 9TD

Timeline

Dates from the published record

  1. 14 Aug 2024

    Received by Conwy

  2. 28 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 21 Oct 2024

    Decision issued: Approved With Conditions

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 42 Overlea Avenue Deganwy Conwy LL31 9TD

    0/48730 Submitted 23 Jul 2021 55m away

    Proposed loft conversion

    Granted Full applications Loft or dormer 9 docs
  • 16 Warren Road Deganwy LL31 9SU

    0/53006 Submitted 20 Nov 2025 90m away

    Operational development comprising the erection of a raised platform structure situated upon the roof of an existing outbuilding as shown in the photo at appendix 1. (Application deemed to have been made by virtue of section 174 of Town and Country Planning Act 1990 Appeal lodged in respect of Enforcement Notice)

    Granted Full applications 15 docs
  • 11 Warren Road Deganwy LL31 9SU

    0/53464 Submitted 9 Jun 2026 106m away

    86% historically approved · decision due ~13 Aug

    First floor side extension to form bedroom and bathroom

    Awaiting decision Full applications Extension 10 docs
  • 41 St Hilary's Drive Deganwy LL31 9SS

    0/51723 Submitted 29 May 2024 125m away

    Proposed Extensions & Major Alterations

    Granted Full applications Extension 19 docs
  • Deganwy School Park Drive Deganwy LL31 9YB

    0/50860 Submitted 26 Apr 2023 132m away

    Enabling demolitions to the life expired modular northwest building and mobile classroom, 2no. new extensions to provide a new dining hall, performance space and classrooms. Refurbishment of the existing building, including re-organisation of classrooms, upgrading learning and resource space, improvement to accessibility, and improvement to thermal performance to meet net zero carbon targets and significantly improve the existing fabric and services. External works include a netball court, covered outdoor learning spaces, and improvement to vehicular and pedestrian access and parking.

    Withdrawn Full applications Extension 33 docs
  • 39 Overlea Avenue Deganwy LL31 9TA

    0/50322 Submitted 20 Dec 2022 136m away

    Proposed Side Extension

    Granted Full applications Extension 11 docs

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications