Ysgol Bod Alaw Abergele Road Colwyn Bay LL29 7ST

Granted Conwy 0/51784 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

The proposal is to install a pre-fabricated temporary building that will be used for the Cylch Meithrin Facility for local children. The Proposal includes Cold Pour rubber crumb footways that will be used to access the facility by parents and children. The footways will be positioned in such a way to avoid any rootzones where possible.. The Building Structure will be secured to existing ground using ground screws to avoid any root zones that may be disturbed by the installation. The Development will include varying ecological measures including bird, bat and swift box building mounted housings aswell as rainwater harvesting. The Building will house ultra low energy Plant and electrical items.

As published by the council, reference 0/51784

Application record

Reference
0/51784
Type
Full
Status
Granted As published: FINAL DECISION
Decision
Granted As published: Approved With Conditions
Received
12 Jun 2024
Validated
25 Jun 2024
Decided
17 Sep 2024
Ward
Glyn
Parish
Cyngor Tref Colwyn Town Council
Decision by
Planning Committee
Postcode
LL29 7ST

Site history

Applications at this address on the Conwy register

This site has had 4 applications since 2021: 3 approved, 0 refused.

  • 0/52954 Granted

    Ysgol Bod Alaw Abergele Road Colwyn Bay LL29 7ST

    Non Material Amendment to Planning Approval 0/51784 (The proposal is to install a pre-fabricated temporary building that will be used for the Cylch Meithrin Facility for local children. The Proposal includes Cold Pour rubber crumb footways that will be used to access the facility by parents and children. The footways will be positioned in such a way to avoid any rootzones where possible.. The Building Structure will be secured to existing ground using ground screws to avoid any root zones that may be disturbed by the installation. The Development will include varying ecological measures including bird, bat and swift box building mounted housings aswell as rainwater harvesting. The Building will house ultra low energy Plant and electrical items) to allow for changes to cladding and increase size of 12 no windows .

    Decided 8 Dec 2025 Amendments
  • 0/52912 Granted

    Ysgol Bod Alaw Abergele Road Colwyn Bay LL29 7ST

    Approval of condition no 6 (Construction Traffic Management Plan) of planning approval 0/51784 (The proposal is to install a pre-fabricated temporary building that will be used for the Cylch Meithrin Facility for local children. The Proposal includes Cold Pour rubber crumb footways that will be used to access the facility by parents and children. The footways will be positioned in such a way to avoid any rootzones where possible.. The Building Structure will be secured to existing ground using ground screws to avoid any root zones that may be disturbed by the installation. The Development will include varying ecological measures including bird, bat and swift box building mounted housings aswell as rainwater harvesting. The Building will house ultra low energy Plant and electrical items.)

    Decided 13 Nov 2025 Conditions
  • 0/48663 Withdrawn

    Ysgol Bod Alaw Abergele Road Colwyn Bay LL29 7ST

    Construction of new two classroom welsh medium childcare facility including community space. The facility will enable the amalgamation of two childcare groups in a purpose built facility.

    Submitted 28 Jun 2021 Full applications

Timeline

Dates from the published record

  1. 12 Jun 2024

    Received by Conwy

  2. 25 Jun 2024

    Validated

    Checked as complete and ready for consideration.

  3. 17 Sep 2024

    Decision issued: Approved With Conditions

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

27 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Conwy granted permission on 17 September 2024, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Ysgol Bod Alaw Abergele Road Colwyn Bay LL29 7ST

    0/52954 Submitted 5 Nov 2025 50 yards away

    Non Material Amendment to Planning Approval 0/51784 (The proposal is to install a pre-fabricated temporary building that will be used for the Cylch Meithrin Facility for local children. The Proposal includes Cold Pour rubber crumb footways that will be used to access the facility by parents and children. The footways will be positioned in such a way to avoid any rootzones where possible.. The Building Structure will be secured to existing ground using ground screws to avoid any root zones that may be disturbed by the installation. The Development will include varying ecological measures including bird, bat and swift box building mounted housings aswell as rainwater harvesting. The Building will house ultra low energy Plant and electrical items) to allow for changes to cladding and increase size of 12 no windows .

    Granted Amendments Windows or glazing
  • Ysgol Bod Alaw Abergele Road Colwyn Bay LL29 7ST

    0/52912 Submitted 16 Oct 2025 50 yards away

    Approval of condition no 6 (Construction Traffic Management Plan) of planning approval 0/51784 (The proposal is to install a pre-fabricated temporary building that will be used for the Cylch Meithrin Facility for local children. The Proposal includes Cold Pour rubber crumb footways that will be used to access the facility by parents and children. The footways will be positioned in such a way to avoid any rootzones where possible.. The Building Structure will be secured to existing ground using ground screws to avoid any root zones that may be disturbed by the installation. The Development will include varying ecological measures including bird, bat and swift box building mounted housings aswell as rainwater harvesting. The Building will house ultra low energy Plant and electrical items.)

    Granted Conditions
  • Ysgol Bod Alaw Abergele Road Colwyn Bay LL29 7ST

    0/48663 Submitted 28 Jun 2021 50 yards away

    Construction of new two classroom welsh medium childcare facility including community space. The facility will enable the amalgamation of two childcare groups in a purpose built facility.

    Withdrawn Full applications 14 docs
  • Nant Y Glyn Holiday Park Nant Y Glyn Road Colwyn Bay LL29 7RD

    0/52114 Submitted 25 Oct 2024 150 yards away

    84% historically approved · decision due ~3 Jan

    Variation of Conditions 2 and 3 of planning approval 0/48360 (Variation of condition no 2 of planning consent 0/41297 (Demolition of existing chalets and proposed residential development of 33 new dwellings on the site of Nant-Y-Glyn Holiday Park (Outline Planning Permission) to allow for reserved matters to be submitted after 6th April 2021.) to allow for the submission of reserved matters application to 1st February 2028 and condition 3 to be varied to allow commencement of development before 1st February 2032.

    Awaiting decision Full applications New dwelling Demolition 18 docs
    Major scheme
  • Land off Valley Road Colwyn Bay Conwy

    0/48931 Submitted 15 Sep 2021 250 yards away

    Non material amendment to planning consent 0/45845 (Erection of 39 dwellings, public open space and all associated works.) to allow for amendment to Arboricultural Methos Statement

    Granted Amendments 7 docs
    Major scheme
  • Land off Valley Road Colwyn Bay Conwy

    0/50157 Submitted 19 Oct 2022 250 yards away

    Approval of matters required by condition 9 (Remediation measures) of planning permission 0/45845 (Erection of 39 dwellings, public open space and all associated works.)

    Granted Conditions 18 docs
    Major scheme

In Conwy

  • 0/53489 Granted

    Bryn Hafod Llethr Gwytherin Abergele LL22 8YF

    This is the resubmission of 0/52999 - Refurbishment of 3 adjoining derelict barns and conversion to ancillary family accommodation; partial demolition and rebuild of one barn on advice of structural engineer; raising a roof by 800mm to accommodate 1st floor; repointing and repair of original stonework; addition of new windows and skylights; upgrading 2 roofs finishes to slate.

    Received 2 Jun, published by the council 7 Aug 2026 Full applications
  • 0/53636 Granted

    61 B Conway Road Colwyn Bay LL29 7LG

    Variation of Condition no.2 of Planning Approval 0/52534 (PROPOSED CONVERSION OF EXISTING GARAGE/OFFICE SPACE TO ANNEX AND PROPOSAL OF A SINGLE STOREY REAR EXTENSION) to allow for changes to approved plans.

    Received 19 Aug, published by the council 6 Sep 2026 Full applications
  • 0/53572 Granted

    Neuadd Y Plwyf Llanefydd Llanefydd Conwy LL16 5EA

    Installation of a shipping container for storing equipment from the village hall

    Received 11 Jun, published by the council 14 Aug 2026 Full applications
  • 0/53556 Granted

    Sheraton West Parade Llandudno LL30 2BD

    Proposed Extensions & Alterations, and Garage Extension

    Received 11 May, published by the council 7 Aug 2026 Full applications
  • 0/53597 Granted

    Welsh Assembly Government Buildings Sarn Mynach Llandudno Junction LL31 9RZ

    Installation of Battery Energy Storage System (BESS) units, including associated enclosure, infrastructure and ancillary works.

    Received 6 Aug, published by the council 25 Aug 2026 Full applications