Planning application
Cwrt Hewan (Former Masonic Hall) Bangor Road Penmaenmawr LL34 6NP
Works: New dwelling Demolition
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Variation of conditions 2 & 6 of planning consent 0/41682 (Demolition of the existing former Masonic Hall Structure. Construction of residential development consisting of 2 blocks of terraced houses consisting of the 3 plots in each block) to allow for amended plans and discharge of condition 6 (Hard landscaping)
As published by the council, reference 0/51457
Application record
- Reference
- 0/51457
- Type
- Full
- Status
- FINAL DECISION
- Decision
- Approved With Conditions
- Received
- 5 Feb 2024
- Validated
- 13 Feb 2024
- Decided
- 17 Sep 2024
- Ward
- Penmaenmawr
- Parish
- Cyngor Tref Penmaenmawr Town Council
- Decision by
- DC West Team Leader
- Postcode
- LL34 6NP
Timeline
Dates from the published record
-
5 Feb 2024
Received by Conwy
-
13 Feb 2024
Validated
Checked as complete and ready for consideration.
-
17 Sep 2024
Decision issued: Approved With Conditions
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
36 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Masonic Hall Bangor Road Penmaenmawr LL34 6NP
Approval of condition no 8 (samples, finishes, design) of planning consent 0/41682 (Construction of residential development consisting of 2 blocks of terraced houses consisting of the 3 plots in each block)
Granted Conditions New dwelling 20 docs -
Former National School 1 School Lane Penmanemawr Conwy LL34 6LE
Proposed change of use unit no. 1 into 2 no self contained dwellings at the former National School School Lane Penmaenmawr
Granted Full applications 14 docs -
Cwrt Hewan (Former Masonic Hall) Bangor Road Penmaenmawr Conwy LL34 6NP
Non Material Amendment to Planning Approval 0/51457 (Variation of conditions 2 & 6 of planning consent 0/41682 (Demolition of the existing former Masonic Hall Structure. Construction of residential development consisting of 2 blocks of terraced houses consisting of the 3 plots in each block) to allow for amended plans and discharge of condition 6 (Hard landscaping) to allow for alterations to the wording of conditions 3, 4, 5 and 8 to remove the pre-commencement restrictions attached to them all. We request that the conditions instead read that all work should be undertaken in accordance with the details submitted and approved to discharge conditions 3, 4 and 5 of permission 0/47225, along with condition 8 of permission 0/48536.
Granted Amendments New dwelling Demolition 6 docs -
Land at Former National School School Lane Penmaenmawr Conwy LL34 6LE
Approval of matters required by conditions 3 & 4 of planning consent 0/43838 (Proposed erection of a pair of semi detached houses on land at the former national school)
Granted Conditions 8 docs -
Land Off Bangor Road Penmaenmawr Conwy
Variation of condition no 6 ( Car Parking, Access, Turning Head, Footpath, Tactile Crossing & Refuse Collection) of planning approval 0/45282 (Erection of 5 no. market dwellings and 2 no. affordable dwellings with associated car parking spaces and private gardens) to allow footpath detail to be amended
Refused Full applications 16 docs -
Bryn Euryn Esplanade Penmaenmawr Conwy
86% historically approved · decision due ~8 Oct
Retrospective application for the addition of a front entrance porch to existing dwelling
Awaiting decision Full applications Extension 5 docsSmall domestic
Other full applications applications
In Conwy
-
0/52696 Granted
Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY
Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd
-
0/53549 Refused
2 A Mostyn Street Llandudno LL30 2PS
Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)
-
0/53528 Refused
Riviera 13 Arvon Avenue Llandudno LL30 2DY
Change of use from guest house (C1) to a single dwellinghouse (C3)
-
0/53502 Granted
15 Maes Rhun Tyn Y Groes Conwy LL32 8PA
Erection of side/rear extension, with infill, part conversion of existing garage
-
0/53550 Granted
60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP
Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.