Planning application

12 Mckinley Road, Llandudno Junction, LL31 9DY

Granted Conwy 0/50316 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Proposed erection of 2 no residential units including access, parking and drainage requirements

As published by the council, reference 0/50316

Application record

Reference
0/50316
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
9 Dec 2022
Validated
22 Dec 2022
Decided
23 Apr 2023
Ward
Glyn y Marl
Parish
Cyngor Tref Conwy Town Council
Decision by
Planning Committee
Postcode
LL31 9DY

Timeline

Dates from the published record

  1. 9 Dec 2022

    Received by Conwy

  2. 22 Dec 2022

    Validated

    Checked as complete and ready for consideration.

  3. 23 Apr 2023

    Decision issued: Approved With Conditions

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

56 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 12 Mckinley Road Llandudno Junction LL31 9DY

    0/51568 Submitted 20 Mar 2024 0m away

    Approval of details required by conditions 5 (Construction Method Statement), 7 (Materials), 8 (Biodiversity Enhancement), 9 (Landscaping), 12 (Highway Improvements) and 13 (Biodiversity and Habitat Mitigation) of planning consent 0/50316 (Proposed Erection of 2 No. residential units including access, parking and drainage requirements)

    Granted Conditions 29 docs
  • 12 Mckinley Road Llandudno Junction LL31 9DY

    0/53367 Submitted 20 Apr 2026 0m away

    Approval of condition no 14 (Photovoltaic Panels) of planning approval 0/51569 (Variation of condition no 2 of planning consent 0/50316 (Proposed erection of 2 No. residential units including access, parking and drainage) to allow for installation of photovoltaic panels to the roof)

    Granted Conditions 8 docs
  • Land at McKinley Road Llandudno Junction

    0/48982 Submitted 16 Sep 2021 0m away

    Redevelopment of a brownfield site to provide 2 no. semi-detached townhouses

    Withdrawn Full applications 18 docs
  • 144 Conway Road Llandudno Junction LL31 9ND

    0/52976 Submitted 3 Nov 2025 69m away

    Approval of Condition no. 2 (External Lighting and Specification) of Planning Approval 0/52752 (Installation of 2 no. externally illuminated fascia signs and 1 no. externally illuminated projecting sign.)

    Granted Conditions
  • 144 Conway Road Llandudno Junction Conwy LL31 9ND

    0/52929 Submitted 21 Oct 2025 69m away

    Variation of condition no 3 of planning approval 0/52259(Change of use of a building society (Class A2) to a Hot Food Takeaway (Class A3), installation of extraction and ventilation equipment and minor external alterations) to enable the new Dominos to operate until 11pm daily

    Granted Full applications
  • 163 Conway Road Llandudno Junction LL31 9EG

    0/52892 Submitted 10 Sep 2025 97m away

    Variation of condition nos 2 4 5 & 8 of planning approval 0/51632 (Change of use from shop (A1) to a restaurant and takeaway use (A3) and associated alterations) to allow for changes to approved plans, change to extraction system and changes as flue and grease trap installed

    Granted Full applications 21 docs

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications