Skip to content
PlanIndex Get alerts
Menu

Planning application

The Grange 1 Oak Drive Colwyn Bay LL29 7BS

Granted Conwy 0/50054 Full

Works: Windows or glazing

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

The replacement of some windows with double glazed, slimlite windows to match as closely as possible the design appearance of the original. The encapsulation of some existing stained glass windows. The installation of some new stained glass panels where originally there would have been some that have since been removed.

As published by the council, reference 0/50054

Application record

Reference
0/50054
Type
Full
Status
Granted As published: FINAL DECISION
Decision
Granted As published: Approved With Conditions
Received
15 Sep 2022
Validated
20 Sep 2022
Decided
14 Nov 2022
Ward
Rhiw
Parish
Cyngor Tref Colwyn Town Council
Decision by
Case Officer
Postcode
LL29 7BS

Site history

Applications at this address on the Conwy register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • 0/48652 Granted

    The Grange 1 Oak Drive Colwyn Bay LL29 7BS

    Certificate of lawfulness for the existing use as use class C2 Residential Institution

    Decided 5 Aug 2021 Lawful development

Timeline

Dates from the published record

  1. 15 Sep 2022

    Received by Conwy

  2. 20 Sep 2022

    Validated

    Checked as complete and ready for consideration.

  3. 14 Nov 2022

    Decision issued: Approved With Conditions

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Conwy granted permission on 14 November 2022, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Conwy

  • 0/53489 Granted

    Bryn Hafod Llethr Gwytherin Abergele LL22 8YF

    This is the resubmission of 0/52999 - Refurbishment of 3 adjoining derelict barns and conversion to ancillary family accommodation; partial demolition and rebuild of one barn on advice of structural engineer; raising a roof by 800mm to accommodate 1st floor; repointing and repair of original stonework; addition of new windows and skylights; upgrading 2 roofs finishes to slate.

    Received 2 Jun, published by the council 7 Aug 2026 Full applications
  • 0/53636 Granted

    61 B Conway Road Colwyn Bay LL29 7LG

    Variation of Condition no.2 of Planning Approval 0/52534 (PROPOSED CONVERSION OF EXISTING GARAGE/OFFICE SPACE TO ANNEX AND PROPOSAL OF A SINGLE STOREY REAR EXTENSION) to allow for changes to approved plans.

    Received 19 Aug, published by the council 6 Sep 2026 Full applications
  • 0/53572 Granted

    Neuadd Y Plwyf Llanefydd Llanefydd Conwy LL16 5EA

    Installation of a shipping container for storing equipment from the village hall

    Received 11 Jun, published by the council 14 Aug 2026 Full applications
  • 0/53556 Granted

    Sheraton West Parade Llandudno LL30 2BD

    Proposed Extensions & Alterations, and Garage Extension

    Received 11 May, published by the council 7 Aug 2026 Full applications
  • 0/53597 Granted

    Welsh Assembly Government Buildings Sarn Mynach Llandudno Junction LL31 9RZ

    Installation of Battery Energy Storage System (BESS) units, including associated enclosure, infrastructure and ancillary works.

    Received 6 Aug, published by the council 25 Aug 2026 Full applications