Skip to content
PlanIndex Get alerts
Menu

Planning application

Beach and Promenade at Colwyn Bay between Colwyn Bay Station and Abbey Road

Granted Conwy 0/49659 Discharge of Conditions

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Approval of condition nos 11 (Environmental Management Plan), 12 (Site Construction Plan) & 16 (Biodiversity Monitoring and Remediation Scheme) of planning approval 0/49306 (The Colwyn Bay Phase 2B proposed development forms part of the wider Colwyn Bay flood defence and public realm improvements. The proposed development can be split into three distinct aspects; Coastal Works, Public Realm Promenade improvements and landscaping works. The Scheme comprises improvements to the coastal defences in this area along with associated promenade regeneration)

As published by the council, reference 0/49659

Application record

Reference
0/49659
Type
Discharge of Conditions
Status
Granted As published: FINAL DECISION
Decision
Granted As published: Approved With Conditions
Received
3 May 2022
Validated
17 May 2022
Decided
30 May 2022
Ward
Glyn, Llandrillo Yn Rhos (pre 05-2022), Rhiw (pre 05-2022)
Parish
Cyngor Tref Bay of Colwyn Town Council
Decision by
DC East Team Leader

Site history

Applications at this address on the Conwy register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • 0/49306 Granted

    Beach and Promenade at Colwyn Bay between Colwyn Bay Station and Abbey Road

    The Colwyn Bay Phase 2B proposed development forms part of the wider Colwyn Bay flood defence and public realm improvements. The proposed development can be split into three distinct aspects; Coastal Works, Public Realm Promenade improvements and landscaping works. The Scheme comprises improvements to the coastal defences in this area along with associated promenade regeneration.

    Decided 15 Mar 2022 Full applications

Timeline

Dates from the published record

  1. 3 May 2022

    Received by Conwy

  2. 17 May 2022

    Validated

    Checked as complete and ready for consideration.

  3. 30 May 2022

    Decision issued: Approved With Conditions

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

69 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Conwy granted permission on 30 May 2022, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Beach and Promenade at Colwyn Bay between Colwyn Bay Station and Abbey Road

    0/49306 Submitted 24 Dec 2021 50 yards away

    The Colwyn Bay Phase 2B proposed development forms part of the wider Colwyn Bay flood defence and public realm improvements. The proposed development can be split into three distinct aspects; Coastal Works, Public Realm Promenade improvements and landscaping works. The Scheme comprises improvements to the coastal defences in this area along with associated promenade regeneration.

    Granted Full applications 120 docs
  • Combermere Gardens Promenade Rhos on Sea

    0/50583 Submitted 22 Feb 2023 50 yards away

    Installation of three kinetic sculptures to act as gateway features

    Granted Full applications 18 docs
  • 1 Everard Road Rhos on Sea Colwyn Bay Conwy LL28 4EY

    0/51923 Submitted 20 Aug 2024 50 yards away

    Removal of condition no 4 of planning approval 0/47690 (Change the usage to A3) to allow full use as an A3 business and is not restricted to an overflow space

    Granted Full applications 9 docs
  • 1 Everard Road Rhos On Sea LL28 4EY

    0/47690 Submitted 4 Sep 2020 50 yards away

    Change the usage to A3

    Granted Full applications 12 docs
  • 79A Rhos Promenade Rhos On Sea Conwy LL28 4PR

    0/53617 Submitted 11 Aug 2026 50 yards away

    84% historically approved · decision due ~20 Oct

    Formation of first floor balcony off existing first/second floor flat above commercial premises

    Awaiting decision Full applications 9 docs
  • 24 Rhos Road Rhos On Sea LL28 4RN

    0/48768 Submitted 28 Jul 2021 100 yards away

    Display of 2 no illuminated fascia signs, 2 no illuminated hanging sign and 1 no non illuminated mural

    Granted Advertising 11 docs

In Conwy

  • 0/53593 Granted

    Land Off Heol Dirion Colwyn Bay LL29 8QA

    Approval of condition nos 5 (Soft Landscaping) 6 (Hard Landscaping) 8 (Materials) 9 (Locations of Tactile Crossing Points) & 12 (Street Lighting Scheme) of Planning Approval 0/52376 (Proposed development of 27 no. dwellings (affordable homes) on land at Heol Dirion, Colwyn Bay)

    Received 5 Aug, published by the council 25 Aug 2026 Conditions
  • 0/53541 Granted

    The Outlook Pydew Road Bryn Pydew Llandudno Junction LL31 9QD

    Approval of Condition no, 4 (Specification of roof and external materials) of Planning approval 0/51320 (Erection of dwelling, car parking and associated landscaping)

    Received 2 Jun, published by the council 7 Aug 2026 Conditions
  • 0/53605 Granted

    Evangelical Fellowship Mill Road Llanfairfechan LL33 0TG

    Approval of condition nos 2 & 3 (Materials) of planning approval 0/53125 (Application for reserved matters seeking approval of the details of the appearance, landscaping, layout, access and scale associated with Outline Planning Permission Ref 0/52471)

    Received 10 Aug, published by the council 25 Aug 2026 Conditions
  • 0/53602 Granted

    12 Hawes Drive Deganwy LL31 9BW

    Approval of Condition no. 4 (Biodiversity Enhancement Plan) of Planning Approval 0/53357 (Demolition of existing garage and rear flat roof extension to facilitate the construction of a proposed rear and side flat roof extension. Demolition of two existing rear dormers and erection of a single replacement rear dormer, along with replacement of the existing front dormer. Removal of existing uPVC front porch and installation of 80mm external wall insulation. New air source heat pump.)

    Received 30 Jul, published by the council 25 Aug 2026 Conditions
  • 0/53622 Granted

    Porth Eirias In The West to Splash Point (By Old Colwyn Arches) In The East

    Approval of condition no 9 (Construction Site & Traffic Management Plan (CSTMP)) of planning approval 0/49272 (Planning application seeking full planning permission for the implementation of a coastal and storm defence scheme comprising of a series of coastal protection measures, including the construction of a rock revetment along with alterations to provide improved pedestrian and cycle access, and associated public realm improvement works along Colwyn Bay, from Porth Eirias in the west to Splash Point (by Old Colwyn Arches) in the east)

    Received 17 Aug, published by the council 30 Aug 2026 Conditions