Skip to content
PlanIndex Get alerts
Menu

Planning application

52 Rhos Road Rhos On Sea Colwyn Bay Conwy LL28 4RS

Granted Conwy 0/47933 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Conversion of disused nursing home into 3 no. dwellings, external alterations to building, erection of double garage and alterations to vehicular access

As published by the council, reference 0/47933

Application record

Reference
0/47933
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
20 Nov 2020
Validated
1 Dec 2020
Decided
29 Jun 2021
Ward
Llandrillo Yn Rhos (pre 05-2022)
Parish
Cyngor Tref Bay of Colwyn Town Council
Decision by
Case Officer
Postcode
LL28 4RS

Timeline

Dates from the published record

  1. 20 Nov 2020

    Received by Conwy

  2. 1 Dec 2020

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jun 2021

    Decision issued: Approved With Conditions

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

38 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • School Rooms Site Elwy Road Rhos On Sea Colwyn Bay LL28 4SB

    0/48838 Submitted 23 Aug 2021 24m away

    Demolition of existing structure and construction of 5 no apartments together with new vehicular access (Outline)

    Granted Outline New dwelling Demolition 27 docs
    Several homes
  • 52 Rhos Road Rhos On Sea LL28 4RS

    0/53218 Submitted 16 Feb 2026 27m away

    Approval of condition no 9 (Footway and Crossing Facility) of planning approval 0/47933 (Conversion of disused nursing home into 3 no. dwellings, external alterations to building, erection of double garage and alterations to vehicular access)

    Granted Conditions 9 docs
    Several homes
  • Church Hall adj no 2 Elwy Road Rhos on Sea Colwyn Bay LL28 4SB

    0/53011 Submitted 19 Nov 2025 41m away

    Demolition of derelict church hall (Demolition Prior Approval)

    Granted Prior approval Demolition
  • Rhos On Sea Methodist Church Rhos Road Rhos On Sea Colwyn Bay Conwy LL28 4RS

    0/52067 Submitted 15 Oct 2024 46m away

    Non Material Amendment to planning approval 0/50107 (Change of Use from Church D1 into a single dwelling house C3) to allow for the retention of the original church area as the open plan living area - formally this was to be split up to become the bedroom area. The bedrooms are now located near the back garden. Also adding a mezzanine floor in the main area to enhance the living space. The changes effectively amount to a slight change in internal layout - but fundamentally there are no change to the approved permission.

    Granted Amendments 6 docs
    Domestic
  • Rhos On Sea Methodist Church Rhos Road Rhos On Sea LL28 4RS

    0/53014 Submitted 25 Nov 2025 51m away

    Certificate of Lawfulness for the existing use of the dwelling as short term commercial holiday let (C6)

    Refused Lawful development 19 docs
    Domestic
  • Y Gorwel Llwyn Onn Rhos On Sea LL28 4BZ

    0/46727 Submitted 20 Sep 2019 100m away

    Conversion of vacant commercial property into dwelling

    Granted Full applications 26 docs
    Domestic

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications